Laserfiche WebLink
(6) Not observed. <br />(7) Work was underway on the relocation of the emergency spillway. <br />(8) Varies with use of bath and sanitary stations. <br />(9) Yes <br />(10) Containment pond. There was no construction discharge. <br />The following sites where sediment control measures other than sedimentation ponds are used <br />were inspected. <br />Descri tion Condition <br /> <br />Rockdust Tank Good. <br />Fish Creek Dewaterin Site Good. <br />Site of former CYCC Office <br />Buildin Good. <br />Sandstones Power <br />Substation Good. <br />Railroad Spur Extension <br />Area Good. <br />Stoker Coal Loadout Good. <br />Overland Belt West Good. <br />Stora a and Trainin Area Good. <br />7 North Esca e Shaft Good. <br />EMD Ventilation Shaft Good. <br />EMD Dewatering <br />Treatment Facili Authorized but not constructed. <br />Rockfall Hazard Trenches Good. <br />NMD Power Borehole and <br />Substation Good. <br />NW Mains Ventilation <br />Shaft Good <br />18-Ri ht Ventilation Shaft Good. <br />Scoria Stora e Area The site has been become a art of a haul road. <br />Water oint Good <br />Conductivity, pH and temperature of regional waterways were field tested. Results aze indicated <br />at locations shown on the map at the end of this inspection report. <br />BACKFILL AND GRADING <br />Most of the areas that require backfill and grading aze areas of long-term surface support <br />facilities and underground portals, shafts, and drill holes. Some backfilling and grading during <br />construction of underground utility lines has been accomplished. There has been no backfilling <br />and grading reported in Annual Reclamation Reports. <br />C-1982-056. CC Inspection of IS May 2007, Page 5 of 14 pages. BGW <br />