Laserfiche WebLink
• (Page 31 • <br />MINE ID # OR PROSPECTING ID # M-94-081 <br />INSPECTION DATE 1-28-2000 <br />The following problems (PB) andlor possible violations (PV) land suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible <br />violations should be corrected by the dales given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />There is a vertical highwall located on the north side of the east pit, though the 03-17-2000 <br />permit states that mining will maintain final approved slopes. PB or PV: PB <br />TOPICISI: BG <br />CORRECTIVE ACTION: MP , _, _ <br />Either revise the permit to allow for a highwall to occur on site during mining, or <br />reduce the highwall to the approved final grade and submit photo-documentation of <br />the completed corrective action. Either corrective action must be completed by the <br />date specified to the right. <br />INSPECTOR'S INITIALS SSS <br />2. The west pit appears to have been completed in 1996, but there is no evidence that 5-1-2000 <br />revegetation tasks have been conducted. PB or PV: PB <br />TOPIC(S): RS <br />CORRECTIVE ACTION: _, _, _ <br />Specify the status of the mining operation in the west pit. If mining is completed, <br />perform the approved reclamation tasks as soon as weather allows this spring and <br />submit photo~ocumentation of the completed reclamation tasks by the correction <br />date to the right. <br />3. <br />CORRECTIVE ACTION: <br />PB or PV:_ <br />TOPIC(S) <br />