Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION sheen of 2 <br />Agency or organization name :Colorado Division Of Reclamation, Mining, And Safety <br />Task # : 004 State :Colorado PermiUjob # : M-1999-073 <br />Date : 12/26/2006 County :Costilla Abbreviation :none <br />User : KAP Site :Pit 1 Filename :M073-004 <br />Permit or other job action : Bond Calculation Related To Inspection <br />Task description : Mobilize/Demobilize <br />EQUIPMENT TRANSPORT RIG COST Shift basis : ~~ 1 per da <br /> y <br /> Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (257; 50T, and 1OOT) <br /> Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br /> Operating cost/hour : $44.38 $46.13 ' $50.07 <br /> Operator cost/hour : $27.66 $27.66 $27.66 <br /> HelpercosUhour: $0.00 $25.39 $25.39 <br /> Total Unit CosUhour ; $88.67 $117.55 $125.45 <br />Machine <br />Description WeighUunit <br />(Tons) Ownership <br />CosUhr/unit Haul Rig <br />CosUhr/unit Fleet Size <br />(No. units) Haul Trip <br />CosUhr/fleet Return Trip <br />CosUhr/fleet DOT permit <br />CosUfleet <br />-Cat D8R Series 11 - 8SU (20 52.55 $51.18 $125.45 1 $176.63 $125.45 $0.00 <br />-Revegetation equipmant 10.00 $100.00 $88.67 ~ 1 $188.67 $88.67 $0.00 <br />$365.30 ~ $214.12 ~I $0.00 <br />