My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC05155
DRMS
>
Back File Migration
>
Inspection
>
INSPEC05155
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:59:51 PM
Creation date
11/18/2007 8:20:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999073
IBM Index Class Name
Inspection
Doc Date
12/28/2006
Doc Name
Bond Calculation related o inspection
From
DRMS
To
DRMS
Inspection Date
11/8/2006
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 002 State :Colorado Permit/job# : M-1999-073 <br />Date : 12/26/2006 County :Costilla Abbreviation : none <br />User: KAP Sit <br />P <br /> e: <br />r(1 Filename: M073-002 <br />Agency or organization name :Colorado Drvisron Of Recfamation <br />Mining And Safet <br /> <br />Permit or otherjob action <br />:Bond Calculation related , <br />to Inspection , <br />y <br />Task description :Spread Topsoil <br />HOURLY EQUIPMENT COST ~ ~ ~~ ~~ <br /> Basic machine :Cat D8R Series ll - 8SU (200; Horsepower : 310 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization 9'0 <br />Cost Breakdown : Ownership cosUhour : $58.24 NA <br /> Operating cost/hour : $73.75 100 <br /> Ripper op. cost/hour : $3.43 50 <br /> Operator cost/hour: $32.78 Nq <br /> Total unit cosUhour : $168.20 Total fleet cosUhour : $168.20 <br />MATERIAL QUANTITIES ~--- ~~~ ~ ~ -~ --. <br />Initial Swell <br />Loose <br />volume : 1,000 BCY factor: 1.429 volume : 1,429 LCY <br />Source of estimated volume :Inspection Observation <br />Source of estimated swell factor : Toosoil <br />HOURLY PRODUCTION <br />Average push distance ; 100 feet <br />Unadjusted hourly production : 852.6 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 20.00 % (i <br />Average site altitude : 8,700 feet <br />Material weight : 1,600 Ibs/LCY <br />Weight description <br />Top Soi! <br />JOB TIME AND COST ~-- -- ~~~ <br />Fleet size : 1 Dozers) <br />Unit cost : $0.215 /LCY <br />Source <br />Operator skill : 0.7g <br />Material consistency : 0.90 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency . 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.43 <br />Altitude : 1.00 <br />Material weight : 1.44 <br />Blade type : 1.00 <br />Net correction : 0.92 <br />Adjusted unit production : 783.17 LCY/hr <br />Adjusted fleet production : <br />--- 783.17 LCY/hr <br />^-"-....^m-.~~ <br />Total job time : 1.82 Hours <br />Total job cost : $307 <br />
The URL can be used to link to this page
Your browser does not support the video tag.