My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC05132
DRMS
>
Back File Migration
>
Inspection
>
INSPEC05132
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:59:51 PM
Creation date
11/18/2007 8:20:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Inspection
Doc Name
Inspection Report
Inspection Date
2/25/2004
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. COMMENTS-COMPLIANCE HG Loadout C-92-O81 <br />25 F=ebruary 2004 ~j <br />page 1/1 <br />Below are comments on the inspection. The comments include discussion of observations <br />made during the inspection. Comments also describe any enforcement actions taken during <br />the inspection and the facts or evidence supporting the enforcement action. <br />This was an aerial inspection of the Hayden Gulch Loadout conducted by Jim Stark <br />of CDMG. Harry Ranney of CDMG took the photographs. This is a loadout facility <br />only and it is currently in temporary cessation. The weather was clear and the <br />ground was partially covered with snow. <br />The truck loop pond (pond 001) appeared to contain a small amount of water <br />several feet below the discharge pipe. The pond did not appear to be (or have <br />been) discharging. The pond embankment was covered with snow but appeared to <br />be stable. There were no erosional problems observed on the pond embankment. <br />The loadout loop pond appeared to be dry at the time of the inspection. The pond <br />embankment was covered with snow but appeared to be stable. There were no <br />erosional problems observed on the pond embankment. <br />The truck loop (haul road), the road around the lower coal stockpile and the loadout <br />access road to the office building were covered with snow. The access road to the <br />site is the Seneca TAHR. This road was stable and in good condition. <br />The facilities area was covered with snow but it appeared to be stable and in good <br />condition. No erosional problems were observed on the site at the time of the <br />inspection. <br />The Rail Loop appeared to be stable and in good condition at the time of the <br />inspection. <br />
The URL can be used to link to this page
Your browser does not support the video tag.