Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the <br />inspection and the facts or evidence supporting the enforcement action. <br />This was a partial inspection of the Carbon Junction Mine for the month of September, 1996 <br />All ditches and ponds were inspected and found to be in compliance, both ponds were dry and <br />stable. All culverts were clear and capable of functioning as designed. <br />Spoil material is still being deposited on the fill area, therefor, quarterly inspections of the fill <br />must resume and the reports sent to the Division. <br />Enineering work on the redesign of the 100 year diversion is proceeding, however, it has been <br />over 90 days since the problem was identified in the midterm review and there has yet to be a <br />revision submitted. If a revision to rectify this situation has not been received by this office by <br />October 31, 1996, then an NOV will be issued. <br />