Laserfiche WebLink
~am~bert aztb S~~C~cociateg <br />GON9ULTINO OEOTECHNICAL ENOINEER9 AND MATERIAL TE9TINO <br />pAILY FIELD REPORT <br />PROJECT NUMBER: M97042MT DATE: Thursday, 7-17-97 <br />PROJECT NAME: West Elk Mine <br />PROJECT LOCATION: Somerset, Colorado <br />CLIENT: Mountain Coal Company <br />CONTRACTOR: <br />TECHNICIAN: Freeman <br />WEATHER CONDITIONS: sunnyjhot <br />WORK REQUESTED: Density tests <br />FOREMAN: Ns. Colby Reid <br />MORK PER ORMED BY LAMBERT AND SSO IA ES REPRESENTATIVE AND REMARKS <br />I arrived at the project site at 10:00 A. M. as requested by Mr. Colby Reid. I <br />performed soil density tests as requested by Ms. Reid of material being placed on the <br />coal gob pile, using nuclear soil density test methods. Please refer to the test <br />results sheets for approximate test locations and test results. The test results <br />indicate only the relative compaction and soil moisture content of the material tested <br />at the elevation and location tested at the time of .our site visit. <br />I collected two (2) buckets of coal gob samples and returned them to our laboratory <br />for further testing. <br />v. o. sax 1fM v. o. wx aa! 17. sooo a1. <br />DRANO JUMCTgN. CO (1701 YOIRRO!!. CO fIJ01 OURANOO. CO fl~l <br />If70) 7LL41M (170) 1af-11 SA (9701 7lLSOf7 <br />