Laserfiche WebLink
;~ MOUNTAIN COAL COMPANY <br />WEST ELK MINE <br />Quarterly Stockpile and/or Site Inspection Report <br />Somerset, Gunnison County, Colorado <br />Date: October I-2, 1997 Quarter: 3rd Ouarter Rept. 2 of 8 <br />Location: Lone Pine Gulch Facilities. Development Inspector: C. Johnston <br />Waste Pile. Topsoil Stockpile, Roadways <br />Features <br />Problem Comments <br />Erosional: <br />Rills & Gullies Yes No <br />/ <br />Vegetation / <br />Other / <br /> <br />Drainage: <br />Ditches & Channels Yes No <br />/ <br />Maintenance was performed along the entire length <br />Berms / of the Lone Pine Gulch road during third quarter - <br />Linings / ditches and water bars were regraded. Due to the <br />Temporary Structures / heavy rains, further maintenance of [he ditches is <br />Culverts (CMP) / needed from the C3 curve west to the fan bench <br />Other / prior to winter. <br /> <br />Structural: <br />Sideslopes & Stability Yes No <br />/ <br />Cracks or settling / <br />Compaction / <br />Seepage / <br />Underdrains / <br />Monitoring -Survey / <br />Monitoring -Visual / <br />Other / <br /> <br />Reclamation: <br />Seedbed Material Yes No <br />/ <br />Subsoil / <br />Vegetation / <br />Mulch / <br />Other / <br /> <br />General Compliance & Miscellaneous: <br />Signs & Markers Yes No <br />/ <br />Spontaneous Combustion / <br />Roads / <br />Other / <br /> <br />Additional Comments: <br />Seeding of the buried portion of the Lone Pine Gulch pipeline will be completed during the 4th quarter. <br />Action Required or Needed: <br />