Laserfiche WebLink
3Latttbert aitb ~~cotiateg <br />CON9ULTINO OEOTECHNICAL ENQINEEfi9 ANO MATEiiIAL TE8TIN0 <br />DAILY FIELD REPORT <br />PROJECT NUMBER: M97o42MT GATE: Wednesday, 7-23-97 <br />PROJECT NAME: <br />PROJECT LOCATION <br />CLIENT: <br />CONTRACTOR: <br />West Elk Mine <br />Somerset, Colorado <br />Mountain Coal Company <br />West Elk Mine <br />TECHN 1 C 1 AN : Freeman <br />WEATHER CONDITIONS: Overcast/h<~ <br />WORK REQUESTED: Density tests <br />FOREMAN: Mr. Colby Reid <br />MORK PER ORHED BY L HBERT AND SSOCI TES REPRESENTATIVE AND REMARKS <br />I arrived at the project site at 1:15 P.M. as requested by Mr. Colby Reid. I <br />performed soil density tests as requested by Mr. Reid of material being placed in <br />the upper portion of the coal gob pile, using nuclear soil density test methods. <br />Please refer to the test results sheets for approximate test locations and test <br />results. The test results were verbally given to Mr. Reid of West Elk Mine at the <br />time of our site visit. The test results indicate only the relative compaction and <br />soil moisture content of the material tested at the elevation and location tested <br />at the time of our site visit. <br />v. o. sa: 7we r. o. eo: oo.~ 7/ a eooo ON. <br />OPANO JUNCTION, CO II SO= YOMI107~. CO ~1J07 OURANOO. CO ~17e1 <br />(f 701 7WSG (f70) 7~~.717.1 (9701 73i3Cas <br />