Laserfiche WebLink
(Page 2) <br />MINE ID # OR PROSPECTING ID #: - M-ioRe-nos <br />INSPECTION DATE: ~ ~-~-n~ INSPECTORS INITIALS: J nn <br />OBSERVATIONS <br />This was a follow up inspection to check compliance with problems 1 & 2 of the 10-25-2000 monitoring <br />inspection. Problem No. 1 was concerning protection of a topsoil stockpile from erosion. Problem No. 2 was a <br />sedimentation problem from a ditch that diverted runoff from the stockpile/processing area to a drainage <br />leaving the permit area. Both items have been corrected. The stockpile had been seeded and some crass <br />had established. However, fhe grass stand still was not sufficient cover to control all of the erosion place. <br />With some more time the vegetative cover may be satisfactory. The sedimentation problem had been taken <br />care of by diverting all of the plant/stockpile runoff into the active quarry where there is no outlet to natural <br />drainages. Donald Opheim was present for the inspection. <br />No other problems were noted, as this was only an inspection to follow up on the two corrective action Items. <br />I & E Contact Address <br />NAME: Donald Ooheim <br />OPERATOR: Centennial Materials. Inc. <br />STREET: 1 lnl 7nneka Way <br />CITYJSTATEjZIP: Cantle Rnck rn £i01n4 <br />cc: I' CE <br />I' BL <br />t FS <br />I' H W <br />t HMWMD (CH) <br />t SE <br />I' WQCD (CH) <br />I' OTHER <br />