Laserfiche WebLink
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation State Program <br />Permtttee/ ROCKY MOUNTAIN BANK Permit C 87 072 Field Visit 03/02/2000 Continuation Page <br />Person Number Date <br />28. Performance Standard Categories <br />Codes: 1=CompBance, 2=Noncompliance, 3=Not Planned, 4=Not Started, S=Noncompliance Identified E sewhere, 6=Previously Cited <br />B. <br />C. <br />1. _ Mining within Valid Permit <br />2. _ Mining within Bonded Area <br />3. _ Terms & Conditions of Permit <br />4. _ Liability Insurance <br />5. _ Ownership and Control <br />6. _ Temporary Cessation <br />7. _ AML Rec. Fees -- Non-Respondent <br />8. _ AML Rec. Fees -- Failure to Pay <br />Hydrologic Balance <br />1._ Drainage Control <br />2._ Inspections & Certifications <br />3._ Siltation Swctures <br />4._ Discharge Swcmres <br />5._ Diversions <br />6._ Effluent Limits <br />7._ Cround Water Monitoring <br />8._ Surface Water Monitoring <br />9._ Drainage -- Acid-Toxic Materials <br />10._ Impoundments <br />11._ Sueam Buffer Zones <br />Topso6 & Subsoil <br />l._ Removal <br />2._ Substitute Materials <br />3._ Storage.and Protection <br />D. Backfilling & Grading Subsidence Control Plan <br />H. <br />l. _ Exposed Openings _ <br />I. Roads <br />2. _ Contemporaneous Reclamation Road Conswction <br />1. <br />3. _ Approximate Original Contour _ <br />2. Certification <br />4. _ Highwall Elimination 3._ Drainage <br />5. _ Steep Slopes (includes downslope) 4._ Surfacing and Maintenance <br />6. _ Handling of Acid & Toxic Materials 5. Reclamation <br />7. _ Stabilization (rills and gullies) J, Signs & Markers <br />E. Excess Spoil Disposal 1._ Signs <br />l. _ Placement 2. Markers <br />2. _ Drainage ConVOI Dis/ance Prohibitions <br />K. <br />3. _ Surface Stabilization _ <br />L. Revegefation <br />4. _ Inspections & Certifications 1._ Vegetative Cover <br />F. Coal Mine Waste Timing <br />2. <br /> (Refuse Piles/Impoundmenfs) _ <br />M. Postmioing Land Use <br />l. _ Drainage Conwl <br />2. Surface Stabilization N. Other <br />3. Placement General <br />4 ._ Inspections and Certifications Per(orrnance <br />5 ._ Impounding Swctures Category <br />G. Use Of Explosives ~ 1) forfeiture evaluatioa - <br />1 ._Blaster Certification _ <br />2 ._ Distance Prohibitions 2) <br />3 ._ Blast Stuvey/Schedule _ <br />4 ._ Warnings & Records 3) <br />5 . Control of Adverse Effects _ <br /> Performance Standard Categories <br /> 30 CFR Counterpart <br />A. Admittistrative ......................................................................... <br />1. Valid Permit ........................................................................ ............773.11 <br />2. Mining within Bonded Area ...................................... ..........773.11 <br />3 . Terms & Conditions of Permit ................................... ..........773.17 <br />4. Liability Insurance ..................................................... ...........800.60 <br />5. Ownership and Convol .............................................. ..........778.13 <br />6. Temporary Cessation ..............................842.11(e) & 816/817.131 <br />7. AML Rec. Fees -- Non-Respondent ........................... .....870.15(6) <br />8. AML Rec. Fees -- Failure to Pay ............................... ......870.15(a) <br />E. Excess Spoil Disposal ...........................................(816/817.71-74) <br />1. Placement ................................................................ ...........................71(e) <br />2. Drainage Controt .................................................... ............................71(0 <br />3. SurfaceStabtlrzation ............................................... ............................71(g) <br />4. Inspections & Certifications ................................... ............................71(h) <br />F. Coal Mine Waste(RetusePiles/Impouadmeots) ,,,,,(gl(J817.81-84) <br />1. Drainage Control ................................................... ............................83(a) <br />2. Surface Stabilization .............................................. ............................83(6) <br />3. Placement ................................................................ ...........................83(c) <br />4. Inspections and Certifications ................................. ..........................63(d) <br />5. Impounding Swcmres ........................................... ................................84 <br />B. Hydrologic Balance ......................................(816/817.41-57) <br />G. Use of Explosives ..................................................(816/817.61.68) <br />1. Drainage Control ........................................ .................................45 <br />2. Inspections &Certifications ....................... ......................49(a)(10) <br />3. Siltaton Structures ..................................... .................................46 <br />4. Discharge Strucmres ................................. ..................................47 <br />S. Diversions ....................................:............. .................................43 <br />6. Effluent Limits ........................................... .................................42 <br />7. Ground WaterMoni[oring .......................... ............................4I(c) <br />8. Surface Water Monitoring ......................... .............................41(e) <br />9. Drainage--Acid -Toxic Materials .............. .............................41(0 <br />10. Impoundments ........................................... .................................49 <br />11. Sueam Buffer Zones .................................. .................................57 <br />C. Topsoil &Subsoil ...............................................(816/817.22) <br />1. Removal ..................................................... .............................22(a) <br />2. Substitute Materials .................................... .............................22(c) <br />3. Storage and Protection ............................... ..............................22(c) <br />4. Redistribution ............................................. .............................22(d) <br /> <br />1. Blas[erCertification ............... ............................................................61(c) <br />2. Distance Prohibitions ............. ............................................................61(d) <br />3. Blast Survey/Schedule ........... ............................................................62-64 <br />4. Warnings & Records ............. .........................................................66 & 68 <br />5. Control of Adverse Effects .... .................................................................67 <br />H. Subsidence Control Plan .........................................(817.121-122) <br />I. Roads .................................................................(816/817.150-151) <br />I. Road Construction ................. ..........................................................I50(c) <br />2. Certification ........................... ...........................................................151(a) <br />3. Drainage ................................ ...............................................150(6)-I51(d) <br />4. Surfacing and Maintenance ... .................:.............................I50(e)-151(d) <br />5. Reclamation ........................... ...........................................................150(0 <br />J. Signs & Markers .......................................................(816/817.11) <br />1. Signs ...................................... ...............................................ll(a),(b),&(c) <br />2. Markers ................................. .....................................II(a).(b),(d).(e).&(0 <br />D. Backfilling & Grading ..............................(816/817.95-107) K <br />1. Exposed Openings .....................816/817.13, 14, I5, & 823.1 I & 21 L <br /> <br />2. <br />Com[emporaneous Reclamation ......................... . <br />.........................100 <br />3. Approximate OriginalContour ......................... .................102(a)(I) <br />4. Highwall Elimination ........................................ .................102(a)(2) <br />5. Steep Slopes (includes downslope) ................... .........................107 ly] <br />6. Handling of Acid & Toxic Materials ................. .....................102(c) <br />7. Stabilization (rills and eu0ies) .......................... ........................95(6) <br />Distance Prohibitions .......................................................(761.11) <br />Revegetation .....................................................(816/817.111-116) <br />I. Vegetative Cover .......................................................................I I 1 & 116 <br />2. Timing ..................................................................................................113 <br />Postmining Land Use ..............................................(816/817.133) <br />~~„~~ t~s Page 2 of <br />