Laserfiche WebLink
<br />Date : 15-Aug-2001 <br />User: SSS <br />®~f~M~~ ®I~FU~~ <br />f~d,9~~,9~ FBA COPII <br />I,~: - 49 -c' ~ <br />CIRCES Cost ; ue ~°' ~' ~ - ' "' ~ <br />COSYsSl1MMARY FOr..A ' ~~' ^ L'< ~•~l <br />Permit or'r6ErMq~3 ~;994-011 <br />Oi ' '~~ <br />fXbLr@y~tion : none <br />Filena°rtrf~!ean~ 11-000 <br />Agency or organization name :DMG r <br />Permit or job action :Operater requested recalculation <br /> <br />TASK LIST (DIRECT COSTS( FORM FLEET TASK DIRECT <br />N0. TASK DESCRIPTION USED SIZE HOURS COST <br />01 a -East Old Pit -grade pit boor grader 1 16.3 $2,378 <br /> completed <br /> completed <br /> completed <br /> completed <br /> completed <br />07a -Feedlot Unit - backflll west highwall scraper? 1 2.1 $478 <br /> completed <br />09a -Feedlot Unit -grade backfllled west slope dozer 1 0.3 $56 <br />10a -Feedlot Unif -grade pit floor grader 1 3.81 $553 <br />11 a -NW Unit - bac~ll east 510' o(noRh highwall screpe2 1 52.8 $11,861 <br />12a -NW Unit -grade pit slopes dozer 1 7.21 $1,040 <br />13a -NW Unit -grade pit Boor grader 1 9.4 $1,368 <br />14a -East Old Pit -replace topsoil screpe2 1 18.8 $4,231 <br /> completed <br />16a -Feedlo[ Unif -replace topsoil scrape2 1 6.7 $1,522 <br /> completed <br />18a -Revegetate flat areas of site revege 2 40.0 $39,097 <br />19a -Revegetate slope areas revege 2 24.0 $13,365 <br />20a -Transport reclamation equipment to/from site mobilize 5 2.4 $1,870 <br />21a -Install fencing NA 1 80.0 $8,316 <br /> <br /> <br /> <br /> <br />sueroTALS: 284.2 $86,135 <br />• includes inflatlon factor atliusvnent of NA % TOTAL DIRECT COST = $86,135 <br />INDIRECT COSTS _ ~ ~ _ ~ v <br />OVERHEAD AND PROFIT- Llabillfy lnSUranCe' 155 °/Of dlreCt total= $1335 <br />Performance bond <br />Job superintendent <br />Profit <br />'not required (or eqp. operator serves as super) <br />1.05 <br />NA' <br />10.00 <br />0 <br />_ % of direct total = $904 <br />NA NA total = NA <br />of direct total = $8,614 <br />rorALOSP= $10,853 <br />CONTRACT AMOUNT (direq+ O 8 P) _ $96, 988 <br />PROJECT MANAGEMENT- <br />Engineering work and/or contract/bid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $4,849 <br />CONTINGENCY- NA' NA total= NA <br />'contingencies accounted Por of task level TOTAL INDIRECT COST = $15,702 <br />TOTAL BOND AMOUNT (direct + indirect) _ $101,837 <br />,_ Y <br />___ ~ -_.. __. _. _ . __ __ .. _.._ -. ~ ~ . __ v _ _ ...,_...._ .w. .,_.~.,_Liz. _ s ..- ~._.~.~.w..a <br />Site :West End Gravel Pit <br />State :Colorado <br />County :Montrose <br />