My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC04379
DRMS
>
Back File Migration
>
Inspection
>
INSPEC04379
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:59:08 PM
Creation date
11/18/2007 8:15:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994011
IBM Index Class Name
Inspection
Doc Date
1/23/2002
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
1/9/2002
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />l~ <br />CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 12a <br />Date : 08114/2001 <br />User: SSS <br />Agency or organization Hama <br />Permit or other job action <br />Task description <br />HOURLY EQUIPMENT COST <br />State :Colorado Permitrob#: M•1994-011 <br />County :Montrose Abbreviation : none <br />Site :West End Gravel Pit Filename : M011-12a <br />DMG <br />TR-01 <br />NW Un/t Grade andsmooth <br />Basic machine :Cat D8R - 8SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : BOPS Cab <br />Attachment no. 2 : 3-shank ripper <br /> <br /> Utilization % <br />Ownershipcost/hour : $49.50 NA <br />Operating cost/hour : $65.98 100 <br />Ripper op. cosVhour : $0.75 10 <br />Operator cosUhour : $27.99 NA <br />Total unit cosVhour : $144.22 Total fleet cost/hour <br />Cost Breakdown <br />$144.22 <br />Initial Swel I Loose <br />volume: 5,296 LCY factor: NA volume: 5,296 LCY <br />Source of estimated volume :Assume 1100'x f30'slope graded ~ f ac. R. /ec. <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 50 feet <br />Unadjusted hourly production : 1,900.0 LCY/hr <br />Material consistency description <br />Pertly consolidated stockpile <br />Average push gradient : 0.00 % (, <br />Average site altitude : 5,800 feet <br />Material weight : 2, 400 Ibs/LCY <br />Weight description <br />Clay and Gravel - Orv <br />Operator skill : 0.75 <br />Material consistency : 1.10 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : O.BO <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weight : 0.96 <br />Blade type : 1.00 <br />Net correction : 0.52 <br />Adjusted unit production : 739.70 LCY/hr <br />Adjusted fleet production : 734,70 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 7.21 Hours <br />Unit cost : $0.196 /LCY Total job cost : $1,040 <br />'~ S-~ ~. <br />-~._.__-"~_ ~ ~s ~f;~?-.tom <br />Horsepower: 305 <br />Shift basis : 1 perday <br />Data source : (CRGJ <br />
The URL can be used to link to this page
Your browser does not support the video tag.