Laserfiche WebLink
sheet 1 of 2 <br />PROJECT fDENTIFICATION <br />Task # <br />Date <br />User <br />CIRCES Cost Estimating Software <br />Agency or organization name :DMG <br />001 State :Colorado <br />07/20/2004 <br />LDO <br />County :Prowers <br />Site :Wiley Pit <br />PermiUjob # : M-1977-223 <br />Abbreviation :none <br />Filename : M223-001 <br />Permit or other job action :Calculate Reclamation Costs For Stages I And lii <br />Task description :Replace 1/2 of overburden (5 ft.) to pit floor <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Cost Bre <br />Scraper work team -Scraper :Cat 631G <br />-Push dozer:NA <br />Support equipment -Load area : NA <br />-Dump area : NA <br />Road maintenance -Motor grader : NA <br />-Water truck : NA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA NA NA NA <br />Utilization-machine : 100 NA NA NA NA NA <br />-Ripper attachment: NA NA NA NA NA NA <br />Ownerhip cost/hour : $57.25 NA NA NA NA NA <br />OperatingcosUhour: $119.43 NA NA NA NA NA <br />Ripper op.cost/hour: NA NA NA NA NA NA <br />OperatorcosUhour: $25.43 NA NA NA NA NA <br />Unit subtotals : $202.11 NA NA NA NA NA <br />Number of units : 1 0 0 0 0 0 <br />Group subtotals : Work : $202.11 Support : $0.00 Maintenance : $0.00 <br />Total work team cosUhour : $202.19 <br /><.: _.. <br />_. <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 32,266 LCY factor : NA volume : 32,266 LCY <br />Source of quantity take-off :estimated from reclamation plan <br />Source of estimated swell factor : NA <br />