Laserfiche WebLink
Fish Creek borehole is not planned for the near future. The operator has <br />been following its weekly field conductivity monitoring at site 1005 (and <br />other sites on Trout Creek, Middle Creek, and Fish Creek). <br />Ponds C, E, F, and G (along Foidel Creek, in the surface facilities area) <br />appeared to contain little or no water beneath the snowcover. <br />Processing Waste <br />No problems were found on the east face of the refuse pile where a gully <br />was reported in the consultant's 3~d quarter 2002 refuse pile report. <br />Although snowcover limited inspection, the gully appears to have been <br />repaired. The operator's representative, Sandra White, explained that the <br />gully was graded out shortly after the report was issued. <br />Support Facilities <br />I inspected the P.M. bay where waste is stored in 55-gallon drums. There <br />appears to be no more than about 60 drums, which is consistent with <br />Twentymile's Spill Control Plan. No spills were found. <br />4 <br />