Laserfiche WebLink
-2- <br />4. COSTS: <br /># DESCRIPTION AMOUNT <br />a. Backfill portal from waste rock pile $625.00 <br />b. Haul off fuel tank, oil drums, etc. <br /> 1. Three trips @ 2 hrs./trip <br />6 hrs. x $44.40 266.00 <br /> 2. Loading time by hand/trip <br />1 hr, x 3 trips <br /> 3. Labor cost for 2 laborers <br />~ $27.00/hr. for 11 hours 297.00 <br />c. Smooth grade and scarify mine site <br />1. D-7 Cat for 1.7 hrs. ~ $135.00/hr. 230.00 <br />d. Replace to3psoil <br />1. 484 yd x $10.50/yd3 delivered 5,082.00 <br />e. Grade topsoil 162.00 <br />f. Smooth grade and scarify access road <br />1. D-7 Cat for .4 hrs. c4 $135.00/hr. 54.00 <br />g. Grass seed 27.00 <br />h. Fertilizer 2.00 <br />i. Spread fertilizer and broadcast seed 67.00 <br />j. Mulch <br />1. 2400 lbs. ~ $90.00/ton 108.00 <br />k. Spread mulch <br />1. 2 ton/acre ~ $327.00/acre 196.00 <br />1. Remove concrete foundation <br />1. $3.44/ftZ x 20' x 20' 1,376.00 <br />m. Load and haul off concrete <br />1. $71.00/hr. x 5 hrs. 355.00 <br />n. Mob/Demob equipment <br />1. D-7 Cat ~ $232.90/hr. x 4 hrs. 932.00 <br />o. SUBTOTAL $9,779.00 <br /> Overhead ~ 15.8 1,545.00 <br />p. TOTAL (topsoil purchase) $11,324.00 <br />JD/ern <br />M:\oss\ern\wonder.wp <br />