Laserfiche WebLink
<br />CIRCES Cost EstimatlnD Software <br />BULLDOZER WORK <br />Agency or organization name : Division O! Minerals 8 Geology <br />Task p: 002 Slate Colorado PermiViobp:M-79.195 <br />Dale: 17!18,'99 County :Atlams Abbreviation :none <br />User: TAS Site:ROatl Runners Rest li Pil Filename: MI96~002 <br /> <br />Permit or other job action :Final Reclamation <br /> <br />Task description :Hlghwall Redudtion; 4,666 L.F.; 1:1 to 3:7; 10' high <br /> <br />tlOURLY EQUIPMENT COST Basic machine :Car DBN (19%J Horsepower: 285 <br />Blade type :Semi-Universal <br />Attachment no. 1 : BOPS Cab Shift basis : 1 per day <br />Attachment no. 2 : NA <br /> Utilization q. Cost data source: (CRGJ <br />Gost Breaktlown: Ownership coSUhour: 541.10 NA <br />Operating cosMour : 586.64 100 <br />' Ripper op. cosUhour 50.00 NA <br />Operator cosUhour: 523.12 NA <br />Total unit cosMour: 5179.86 Tornl lleet cosUhour: 5239.72 <br />17EB <br />Initial <br />volume'. 4,6% BCY <br />Source of quantity Wkeofl :pen <br />Source of est. Swell factor:prol <br />.N <br />~, HOURLY PRODUCTION <br />Aveage push distance : 60 leet <br />Swell Loose <br />factor: 1.124 volume: 5,164 LCV <br />n <br />Unadjusted hourly production : 1180 LCV/hr <br />Material consistency description <br />Aveage push gradient: 3.00 9e (neg) <br />Average site altitude: 6,000 tees <br />Material weight: 2.900 Ibs1LCY <br />Material weight desorption <br />Sand and p2vel - Drv <br />JOB TIME AND COST <br />Fleet size: 2 Dozers) <br />Unit cost: 50.198 rLCV <br /> <br />Operator skill: <br />0.75 Source <br />(avg.) <br />Material consistency: 0.90 (Cat HB <br />Dozing method: 1.10 (s~by-sJ <br />Visibility: 1.00 (avg.) <br />Job eBicienry: 083 (75hiPoda <br />Spoil Pile : 0.90 (ssddq <br />Push grntlienC L07 (Car HB <br />Altitude: 1.00 (Cal HB <br />Material weight: 0.79 (Car HB <br />Blade type: 1.00 (S or U, <br />Net correction : 0.51 <br />AtlJusted unit production : 605.19 LCY/hr <br />Adjusted fleet production : 7,210.38 LCV/hr <br />Total lob time: 4.27 Hours <br />Total job cost : 57,023 <br />