My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC04106
DRMS
>
Back File Migration
>
Inspection
>
INSPEC04106
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:58:42 PM
Creation date
11/18/2007 8:14:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986004
IBM Index Class Name
Inspection
Doc Date
10/19/2005
Doc Name
Unresolved Problems Noted in Past Inspection Reports
From
DMG
To
Harold Brandstadt
Inspection Date
12/8/2004
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatino Software <br />PROJECT IDENTIFICATION <br />Task # : 02a <br />Date : _01/25/2005 <br />User : SSS <br />State :Colorado <br />County :Delta <br />Site : Brandstadt Rock Pit <br />Agency or organization name : DMG <br />Permit or other job action :Routine bond recalculation <br />Task description :Replace fOp50// OVeI <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D7R Series 11 - 7SU Horsepower : 240 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $40.61 NA <br /> Operating cosUhour : $48.13 100 <br /> Ripper op.cosUhour : $0.00 0 <br /> Operator cosUhour : $31.76 NA <br /> Total unit cost/hour : $120.50 Total fleet cosUhour : $120.50 <br />MATERIAL QUANTITIES ~ ~ - - ~- <br />Initial Swell Loose <br />volume : 1,500 LCY factor : NA volume : 1,500 LCY <br /> <br />Source of estimated volume :Exhibit H <br />Source of estimated swell factor : NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source ~~ <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 75 feet Material consistency : 1.10 (Cat HBJ <br />Unadjusted hourly production : 854.1 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshifUday) <br />Partly consolidated stockpi/e Spoif pile : 0.70 (fnd-mfJ <br /> Push gradient : 1.35 (Cat HB) <br />Average push gradient : 16.00 0 (neg) Altitude : i.00 (Cat H8J <br />Average site altitude : 5,180 feet Material weight : 1.44 (Cat HB) <br /> Blade type : 1.00 (S/SU/UJ <br />Material weight : 1,600 IbslLCY Net correction : 0.93 <br />Weight description <br />Top Soil <br />Adjusted unit production : 793.60 LCY/hr <br />Adjusted fleet producfron : 793.60 LCY/hr <br />Total job time : 1.89 Hours <br />Total job cost : $228 <br />Permit/job# : M-1986-004 <br />Abbreviation :none <br />Filename :M004-02a <br />
The URL can be used to link to this page
Your browser does not support the video tag.