Laserfiche WebLink
• Page -3- <br /> <br />Maior Structures in and Adiacent to Permit ?,rea <br />Comments: <br />Office building ~ <br />Topsoil Handling <br />Quantity of topsoil being salvaged <br />Procedures <br />Proper stockpile location <br />Stockpile stabilization <br />Depth of replaced topsoil <br />Stability <br />Comments: <br />Rule 6.4 <br />No topsoil is being salvage, however fines are being stockpiled for later <br />use in reclamation. <br />Revegetation <br />Vegetation efforts on schedule <br />Site preparation proper <br />Fertilization needed <br />Suitable species <br />Estimate cover <br />Poisonous or noxious species <br />(deed control needed <br />Livestock use <br />!dildlife use <br />Reseeding necessary <br />Fencing <br />Comments: <br />Rule 6.5 <br />No revegetation on quarry area has been done at this time, however some <br />revegetation test plots were done around the office areas and entrance road <br />and are doing fine: <br />Problems <br />Recommendations <br />Quarry operators should be contacted to make sure that .4 master mining <br />plan and reclamation plan is being followed and that the division is aware of <br />both of these plans. <br />At present it is assumed that the planSoutlined in Hall S~~.c <br />Corporation permit are the ones that should be followed for both mining and <br />reclamation. Once mining plan has been clarified this operation should be <br />inspected again in the near future to ensure that all distrubances are within <br />the permit area, and the mining plan for both contractors is compatible. <br />General site description-Coaunents: <br />Was shown site by Mr. Bob Spmer, and his time and cooperation was appreciated. <br />At time of final reclamation the trash along the eastern boundary of the quarry <br />in the area l12aC the crusher should be clean up and the. waste d~ <br />sloped to 2:1 or ~ess and revegetated. <br />j, <br />support facilities <br />