Laserfiche WebLink
15. <br />16. <br />17 <br />18 <br />19 <br />Are there any impoundments and application, or ground wat <br />monitoring wells present? there potential ground water act? N <br />If so, please explain in detail. <br />The sedimentation pond is not lined. The tailings <br />piles ace not located on liners. Ground water <br />impact is an inherent potential at this site. <br />Flow measurement present? Y <br />If so, please describe the device and outtall. <br />Rectangular weir at outfall 001. <br />Is the effluent in compli.snce with the permit? N <br />Is there a compliance schedule? N <br />Is the entity meeting the compliance schedule? <br />Receiving stream/segment/basin: <br />Canyon Creek, Seg 9, Uncocophagre River <br />19. Comments: <br />Periodic violations of zinc limits occur. Runoff <br />should be diverted away from the disturbed areas. <br />The drain from the sedimentation pond needs to 6e <br />identified in the permit. <br />20. Person(s) Interviewed: 1'om Rosemeyer <br />Title: Operator <br />21. CDH Engineer/Tech: Dwain P <br />~~~ <br />. Wabson(303)248-7150 <br />... ._.~~ <br />