My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC04043
DRMS
>
Back File Migration
>
Inspection
>
INSPEC04043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:58:40 PM
Creation date
11/18/2007 8:14:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982090
IBM Index Class Name
Inspection
Doc Date
8/9/1991
Doc Name
ANNUAL INSPECTION OF INDUSTRIAL FACILITY CPDES PN CO-0026981 FOR CAMP BIRD MINE OURAY CNTY
From
CDOH
To
CAMP BIRD COLO INC
Inspection Date
6/17/1991
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indus~al Wastewater <br />Ins tion Report . <br />3E,CTION A: NATIONAL DATA SYSTE% CODING <br />Trans Code CDPS/NPDES Date <br />N 5 CO-0026981 06/17/91 <br />Insp Type Inspector Fac Type <br />C S 2 <br />Fac Eval BI QA County <br />2 N 46 <br />SECTION B: FACILITY DATA <br />1. Legally Responsible Party: <br />Mailing Address: <br />Business Phone: <br />Emergency Phone: <br />Legal Representative: <br />Operator Plant Clasa <br />-000 <br />Camp Bird Colorado Inc. <br />P. 0. Box 806 <br />Salt Lake City <br />(303)325-4355 <br />(303)325-4355 <br />Scott Butters <br />UT 814270000 <br />2. Operating Company: Camp Bird Mine & Mill <br />Mailing Address: P. 0. Box 1790 <br />Ouray CO 814270000 <br />Business Phone: (303)325-4355 <br />Emergency Phone: (303)325-4355 <br />Local Facility Contact: Tom Rosemeyer <br />3. Has any of this information changed since the last inspection? Y <br />4. County in which facility is located: Ouray <br />5. Plant Products: Gold, Silver, Copper, Lead, Zinc <br />Present Production Rate: 0 <br />Design Production Rate: 400 Tons/Day <br />Raw Materials: Hard rock ore <br />SECTION C: AREAS EVALUATED DURING INSPECTION <br />6. Briefly describe the process steps used in producing the product. <br />Include a process flow diagram and a discussion of chemicals used at <br />the site and their final disposition. State the final disposal of <br />wastewater streams. <br />See Attached Diagram. <br />7. What containment does the permittee have for materials used, processed <br />or stored on site? <br />The berms around the fuel storage have been <br />removed, no fuel is currently stored onsite. No <br />other materials are present. <br />Are additional controls necessary? N <br />
The URL can be used to link to this page
Your browser does not support the video tag.