My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC03903
DRMS
>
Back File Migration
>
Inspection
>
INSPEC03903
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:58:33 PM
Creation date
11/18/2007 8:13:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000040
IBM Index Class Name
Inspection
Doc Date
4/28/2004
Doc Name
Insp Rpt
From
DMG
To
Medicine Bow - Routt National Forest USDA Forest Service
Inspection Date
4/28/2004
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 75 <br />Construction Materials Rule 3 <br />affected land after reclamation if suck buildings or structures w~71 not conflict with the <br />post-mining.land use and the structures conform to local building and zoning.codes. <br />3.1.12 Signs and Markers <br />(1) At the entrance of the mine site the Operator shall post a sign, which <br />shall be clearly visible from the access road, with the following: <br />(a) the name of the Operator; <br />(b) a statement that a reclamation permit for the operation has <br />been issued by the Colorado Mined Land Reclamation Board; and <br />(c) the permit number. <br />(2) The boundaries of the affected area will be mazked by monuments or <br />other mazkers that are cleazly visible and adequate fo delineate such boundaries. <br />(a) for Limited Impact 110 Operations the permit boundary for the <br />purposes of this Rule shall be considered the affected azea; <br />(b) for Special 111 Special Operations and Regular 112 Reclamation <br />Operations the area proposed to be disturbed by mining operations for which <br />a Financial Warranty and Performance Watramy have been posted shall be the <br />affected area. <br />(3) The Office may approve an alternative plan for identifying the <br />boundaries of the affected land if the Operator includes such a plan in the permit <br />application. <br />t2t 3.2 INSPECTION AND MONITORING <br />(1). Entry upon lands for inspection: the Board or Office may enter upon <br />the lands of the Operator at all reasonable times for the purpose of inspection to <br />determine whether the provisions of the Act and these Rules have been complied with. <br />(2) Persons authorized under the Act and these Rules to conduct <br />inspections shall, prior to entry onto any lands, notify the Operator of their intent to <br />
The URL can be used to link to this page
Your browser does not support the video tag.