Laserfiche WebLink
<br /> <br />Colorado Division of Minerals and Geology ahee< 1 of 2 <br />ESTIMATING FORM - EpUIPMENT MOBILIZATION / DEMOBILIZATION <br />i 7ask p... 10 Prep. by SCE Filename ..M196-10 <br />Date..... 25-Feb-99 Permit p M-77-196 Mine......Buena Vista Pit <br />Permit Ac Cion........ Estimate reclamation cost <br />Task Description..... Mob/Demob <br />i HOURLY EQUIPMENT COST <br />•---••---••---•••-... N07E - This is a list Co select from, not a list of mandatory items to include. <br />Mob/Demob Eqp. -Tractor 6x4, 75,000 lb GVW, 375 HP, diesel poweretl <br />-LC. Trailer 25 con folding gooseneck, drop deck <br />-Med. Trailer 50 con folding gooseneck, drop deck <br />-Hwy. Trailer 120 Ton folding gooseneck, drop deck <br />-Pilot Car On-highway light duty truck, 4x2, 130 hp, 1/2 ton rating, gasoline powered <br />-Hyd. Crane Grove RTSBE rough terrain hydraulic crane, 20 ton capacity, 125 hp, 70 ft. boom <br />-Fuel Truck 6x4, 3,600 gallon capacity, 210 HP, diesel powered <br />-Cube Truck 6x9, 2,500 gallon capacity, 210 HP, dimel powered <br />-Flashed Truck: 30,000 16 GVY1, 210 HP, diesel powered <br />Ise[ Update: <br />August, 1997 (txucke) <br />--------------------- Lt. Rlg Med.Rig Hvy.Ri9 Pilot Hydraulic Fuel Lube Placbed <br />Cost Breakdown: <-25 T. 26-50 T. > 50 T. Car Crane Truck Truck Truck <br />Ownership Cost/hr 525.59 528.10 531.38 51.73 524.12 $6.88 $12.66 57.88 <br />Operating Coet/hr 528,38 $30.17 532.34 $4.82 531.48 519.57 $25.56 $11.82 <br />Operator Coet/hr - 522.61 522.61 522.61 $21.62 523.13 $22.35 $21.24 $22.35 <br />Helper Cost/hr $21.82 521.82 $21.82 50.00 50.00 50.00 50.00 50.00 <br />Total 598.40 5102.70 5108.15 $28.37 $78.73 $48.80 $59.46 $42.05 <br />NON-ROADABLE EQUIPMEM : <br />---------------------- Height Ownership Haul Rig Fleet Size Haul Trip Return Trip DOT Permit <br />Machine Description (tonal Coet/hr Coet/hr (no. hauled) Cost/hr Cost/hr Coet/ea <br />Ca[ DBN Bulldozer 21.00 543.60 $98.40 1 5142.00 598.40 <br />Subtotals 5142.00 598.40 50.00 <br />