My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC03861
DRMS
>
Back File Migration
>
Inspection
>
INSPEC03861
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:58:32 PM
Creation date
11/18/2007 8:13:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977196
IBM Index Class Name
Inspection
Doc Date
3/1/1999
Doc Name
BUENA VISTA PIT PN M-77-196 DIV ESTIMATE OF COST OF RECLAMATION
From
DMG
To
BARNHART AGENCY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Division of Minerals and Geology <br />ESTIMATING FORM - BULLDOZER WORK <br />Task p: 5 Prep. by: JCS Task File Name: M196-5 <br />____________ _________ _____________ <br />Date: 02/25/99 Permit p:M-77-196 Mine: Buena Vista Pic <br />____________ _________ _________________________________ <br />Permit Action: Estimate reclamation roar <br />_____________________________________________________________ <br />Task Description: Push broken asphalt, concrete and ramp fill into pit <br />_____________________________________________________________ <br />HOURLY EQUIPMENT COST <br />--------------------- Basic Machine: Cat DBN Horsepower : 2a9 <br /> Blade Type: UNIVERSAL __________ <br /> Attachment p1: ROPE Cab Shift Bas r s: 1/day <br /> Attachment p2: l-shank ripper ---_______ <br />CoaC Breakdown: <br />-------------- Utilization t <br />Ovne rship cost/hr - 543.60 N/A <br />OperaCing E overhaul cost/hr- dozer - 555.31 100 <br /> -ripper 50.00 0 <br />Operator cost/hr - 523.12 N/A <br />Total egp t. unit cost/hr - 5122.02 Total fleet coat/ hr : 5122.02 <br /> <br />MATERIAL QUANTITIES ________ ________ <br />Initial Swell Loose <br />Volume: 551.0 LCY Factor: N/A Volume: 551 .0 LCY <br />Source of quantity take-off: Personal eat imate <br /> <br />Source of eat. swell ________ <br />factor: Program <br />___ __________________________ <br /> <br />__________ <br />_____ _____ <br /> <br />_ __ ___________ <br /> <br />HOURLY PRODUCTION _____ ___________ ____ ___ __________ <br />-------••------•• Job Condition Correction Pactors <br />Avg. push distance: 200 ft. ------------------------- ----- -- <br />- -------- Operator.......... 0. 75 lavg.) <br />Unadjusted hourly Mat. consistency.. 0. E0 (Cat Cbl) <br />dozer production: 547 LCY/hr Dozing method..... 1. 00 (gen.) <br />- -------- Visibility........ 1. 00 (avg.) <br />Material consistency: Job efficiency.... 0. 87 (lah/dayl <br />Dry, non-cohesive Spoil pile factor. 1. 00 (doz-oel <br />--------------------- ---------------- Push gradient..... 1. 00 ICat Cbl) <br />Avg. push gradient: 0.00 t Ipoe) Altitude deration. 1. 00 (Ca[ tbl) <br />- -------- Material weight... 0. 82 ICat tbl) <br />Avq. site altitude: 8050 ft. Blade type........ 1. 00 (B or V) <br />_ <br />Material weight ________ <br />2800.00 16/LCY _________________________ <br />Nec Job Correction _____ <br />0. __ <br />41 <br />MdC. DeaCr.: _ ________ ____ _____ __ <br />Granite - Broken <br />_____ <br />___ Adjusted Vnis Prod.: 222. 11 LCY/hr <br />_____ <br />________ ________________ ____ <br />Adjusted Fleet Production: _____ <br />222. __ <br />17 <br />LCY/hr <br />JOB COST ____ _____ __ <br />Fleet eixe 1 Dozer (s) Total Job Time: 2. 48 Hours <br />_ <br />Unit Cos[ _______ <br />50.549 /LCY ____ <br />Socal Job Cost: _____ <br />$702. __ <br />68 <br />
The URL can be used to link to this page
Your browser does not support the video tag.