Laserfiche WebLink
<br />RECLAMATION COST SUMMARY con['d <br />K. PORTAL/SHAFT SEALING <br />Task No.~ Task Description <br />___________________________________________ <br />L. DRILL HOLE/MONITORING HELL SEALING <br />Task No.~ iaek Description <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No.~ Saek Description <br />4 <br />89 <br />10 <br />Demolition <br />Seeding <br />Fen<Sng <br />Mob/Demob <br />l~ <br />sheet 9 of 4 <br />Cos[ (5) <br />Subtotal (K1: <br />~ Cos[ (SI <br />Subtotal (L1: <br />~ Coec (51 <br />Subtotal (M1: <br />TOTAL DIRECT RECLAMATION COETS laub[o[a is A through M): <br />II. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD 4 PROFIT <br />57,894 <br />54,887 <br />5786 <br />513.167 <br />529,216 <br />Item No.~ Item Description ~ Coat (5) <br />1. ~ Publi< Liability Insurance.... 1.560t of dir. ~ $453 <br />2. ~ Contractor's Perforn~ance Bond 1.6EOt of diz. ~ 5453 <br />3. ~ Contra<[or'a Profit........... 10.00t of diz. ~ 52,922 <br />4. ~ Job Superintendent.. <br />________________________________________________________________________ <br />Subtotal (A); 53,827 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 4 P); $33,047 <br />B. DMC PROJECT' ADMINISTRATION E%PENSES <br />Item No.~ Item Description ~ Coat (51 <br />________I______________________________________________________________ <br />1. ~ Minerals Prog [am Admin. Fee a[ $.OOt of cnt r.~ $l,fiE2 <br />NET INDIRECT COST PERCENTAGE: 1B.]6t Subtotal (B1: 51,652 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): 55,479 <br />TOTAL PERFORMANCE BOND AMOUNT (d irecc plus and rrect costs): •'$74,695v <br />