Laserfiche WebLink
<br />III. Comments - Compliance <br />Below are particular issues with regard to any of the compliance items. <br />Enforcement actions resulting from failure to comply with the Act, Rules <br />and Regulations, and the permit also are identified below. <br />Hydrologic Balance (4.05) <br />Pit water was no longer being discharyed into 1~1ann Draw. A small amount <br />of water from groundwater inflow (less than 20 gpm) had accumulated in <br />the pit and periodically was being pumped into sediment pond C. The <br />sediment pond was not discharging. <br />Protection of Fisn, Wildlife and Related Environmental Values (4.18 <br />Antelope fawning season in North Park was in progress at the time of the <br />inspection. During the inspection, one doe fawned less than 25 yards <br />from the east permit boundary. Tne antelope adjacent to the mine nave <br />apparently adapted quite well to the mining activity. <br />