My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC03826
DRMS
>
Back File Migration
>
Inspection
>
INSPEC03826
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:58:30 PM
Creation date
11/18/2007 8:12:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981021
IBM Index Class Name
Inspection
Doc Date
11/23/1983
Doc Name
BOURG STRIP 11/17/83 INSPECTION OUR FN C-021-81
From
MLRD
To
SCOTT PATTEN
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />III. Comments - Compliance <br />Below are particular issues v+ith regard to any of the compliance items. <br />Enforcement actions resulting from failure to comply with the Act, Rules <br />and Regulations, and the pennit also are identified belo~a. <br />Signs and f4arkers (4.02) <br />The temporary topsoil stockpile at the nortneast corner of the east dump <br />requires a topsoil sign. <br />Hydrologic 3alance (4.05) <br />At the time of the inspection sediment pond A was discharging. The <br />operator has taken samples and submitted them to the laboratory for <br />analysis. Sediment pond B was dry at the time of the inspection and the <br />operator has scheduled a cleaning for this pond later this season. It <br />was noted that the Parshall flume placed in f9ann draw requires some <br />attention. The operator will need to remove the small rocks placed at <br />the inlet of the flume and place these closer to the wing walls at the <br />side of the flume. <br />Topsoil (4.Oo) <br />The operator has seeded and mulched the temporary topsoil pile at the <br />northeast corner of the east dwnp. <br />
The URL can be used to link to this page
Your browser does not support the video tag.