Laserfiche WebLink
<br />III. Comments - Compliance <br />Below are particular issues v+ith regard to any of the compliance items. <br />Enforcement actions resulting from failure to comply with the Act, Rules <br />and Regulations, and the pennit also are identified belo~a. <br />Signs and f4arkers (4.02) <br />The temporary topsoil stockpile at the nortneast corner of the east dump <br />requires a topsoil sign. <br />Hydrologic 3alance (4.05) <br />At the time of the inspection sediment pond A was discharging. The <br />operator has taken samples and submitted them to the laboratory for <br />analysis. Sediment pond B was dry at the time of the inspection and the <br />operator has scheduled a cleaning for this pond later this season. It <br />was noted that the Parshall flume placed in f9ann draw requires some <br />attention. The operator will need to remove the small rocks placed at <br />the inlet of the flume and place these closer to the wing walls at the <br />side of the flume. <br />Topsoil (4.Oo) <br />The operator has seeded and mulched the temporary topsoil pile at the <br />northeast corner of the east dwnp. <br />