My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC03805
DRMS
>
Back File Migration
>
Inspection
>
INSPEC03805
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:58:30 PM
Creation date
11/18/2007 8:12:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
Inspection
Doc Name
OSM INSPECTION REPORT
Inspection Date
6/17/1998
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~~~ S. DEPT. OF THE INTERIOR <br />O UR.FACE MINING RECLAMATION AND ENFORCEMENT <br />JUN 2~~!!~-Site Evaluation Inspection Reporl~ <br />oW'a~~,ENH ~o <br />F ~ <br />y <br />J q <br />o ~ <br />~~~ ~~ <br />OF SURFACE <br />mston o 10. Type <br />I. Petmittee/Person 9. Permit Number a. Permn b. RA <br /> BASIN RESOURCES, IIVC. C-013-81 ~ PP <br /> 2. Address I I. inspection Dale (2. Inspection Type 13. Joint Inspection <br /> <br /> 14300 HWY 12 06/17/1998 SPl ~ Y/N <br /> <br />3. City <br />4. State MM OD - 1'Y <br />14. Permit Status <br />15. Site Status 16. Facility Type <br />WESTON CO A^ MC L~~J <br />5. Zip Code 6. Phone Number 17. OSM Office # 18. RSI # 19. Land Code <br />81091 -~ 719-868-2761 140 C] <br />7. Operator if Different than Petmittee 20. M.S.H.A. ID # 21. State Cale 22. County Code <br /> <br /> O$-02820 OS 071 <br /> 8. Mine Name 23. AVS Permi[[ee Entity ID Number 23b. State Office <br /> <br /> GOLDEN EAGLE 103972 <br /> <br />24. Performance Standard Categories <br />Codes: 1=Com licence 2=Noncom licence 3=Not Planned 4=Not Started 5=Noncom lianc~e Identified Elsewhere <br />A. Administrative D. BackCJling & Grading H. 1 Subsidence Control Plan <br />I. 1 Mining within Valid Permit I._Exposed Openings I. Roads <br />2. 1 Mining within Bonded Area 2._Contemporaneous Reclamation 1. 1 Road ('onstruction <br />3.1,Tetms & Conditions of Perm it 3._Approximate Original Contour 2, Certifi~•ation <br />4._Liabili[y Insurance 4._Highwall Elimination 3. 1 Drainage <br />5._Ownership and Control 5._Steep Slopes (includes downslope) q. 1 Surfacing and Maintenance <br />6._Temporary Cessation 6._Handling of Acid & Toxic Materials 5. 1 Reclanta[ion <br />7._AML Rec. Fees -- Non-Respondent 7._Stabilization (rills and gullies) <br />B._AML Rec. Fees -- Failure to Pay E. Excess Spoil Disposal J. Signs & Markers <br />B. Hydrologic Balance 1. 3 Placement I. 1 Signs <br />1. 1 Drainage Control 2. J Drainage Conuol 2. 1 Markers <br />2. Inspections & Certifications 3. 3 Surface Stabilization K. 1 Distance Prohibitions <br />3._Sil[a[ion Structures 4. 3 Inspections & Certifications <br />4. Dischazge SWCtures L. Revegetation <br />Diversions <br />5. F. Coal Mine Waste 1. 1 Vegetaaive Cover <br />_ <br />6._E(Fluent Limits (Refuse PBes/Impoundments) 2.~Tirninl; <br />7._Ground Water Monitoring I. 3 Drainage Control <br />8.~Surface Water Monitoring 2. 3 Surface Stabilization M. 1 Postmining Land Use <br />9._Drainage -- Acid-Toxic Materials 3. 3 Placement <br />10._impoundments 4. 3 Inspections and Certifications N. Other <br />11._Stream Buffer Zones S.~Impounding Sttvctures <br /> <br />C. Topsoil & Subsoil G. Use of Explosives <br />I <br />3 Blaster Certification -I ) <br />I._Removal <br />2 <br />Substitute Materials . <br />2. 3 Distance Prohibitions -2) <br />. <br />3. I Storage and Protection 3.~Blast Survey/Schedule <br />4. 3 Warnings & Records <br />-3) <br />4._Redistribution S.~Conuol of Adverse Effects <br />25. Inspection Frequency 26. Inspection Hours 27. Bonded Acres 2t3. Acres <br />a. Date d last <br />State Complete <br />In <br />cti <br />/ / <br /> <br />2 <br />0 <br />P <br />i <br />R a. Total <br /> <br />0 bonded <br />9 <br />on <br />spe . <br />a. <br />erm <br />t <br />eview . <br />5 I 9068.0 <br />Permitted <br />a <br />Frequency for previous 4 Calendar Qtrs. <br />b. Number of Numher of <br />6 <br />0 b <br />0 <br />C 59 . Phase 1 <br />released . <br />required compete <br />complete ~ inspections ~ . <br />b. Inspection Time . ~ b. Disturbed <br />59.0 <br />inspections conducted <br />Travel Ti <br />~ <br />8'0 ~~ c <br />0.0 . Phase 11 <br />released (Estimated) <br />c. Number of Number of c. <br />me <br />requued partial <br />partial ~ inspections ^p <br />2.0 <br />d <br />Re <br />ort W <br />iti <br />C 0.0 d. Phase III Pa e I of <br />g <br />inspections conducted . <br />p <br />r <br />ng released ~,,,,,, s,r„®~,,, ,,. ,,,, <br />
The URL can be used to link to this page
Your browser does not support the video tag.