Laserfiche WebLink
(Page 2J <br />MINE ID # OR PROSPECTING ID #: nn_t97R_3d9 <br />INSPECTION DATE: nui11'i/ns INSPECTOR'S INITIALS: .-KAi? <br />OBSERVATIONS <br />l .This inspection wos conducted as part of Division of Minerals and Geology's four-year monitoring plan. <br />Present at the inspection were Kate Pickford, DMG, Don Coram, Gold Eagle Mining, Inc., and Dan Burns, U.S. <br />Department of Energy (DOE). Weather at the time of the inspection was clear to partly cloudy, calm, and <br />approximately 80 degrees. <br />2. An appropriate sign is posted at the site. During the last monitoring inspection, conducted on March 15, <br />2002, it was noted that the waste rock pile had encroached to the east permit boundary line. Though concern <br />was conveyed in the previous report that the pile may slough or expand beyond the boundary, the pile has not <br />expanded beyond the permit boundary line. There were no signs of toxic or contaminating materials in the <br />dump material. <br />3. There is a steel storage building and a steel portal shed located on the permit site. Topsoil is stockpiled in a <br />berm configuration. The previous inspection report expressed concern regarding the presence of weeds at the <br />site. The weeds currently appear to be controlled at the site and spraying to manage weeds was being <br />conducted during this inspection. <br />4. Mr. Coram stated that Gold Eagle Mining, Inc. will be reopening the mine soon. Bond for this site is held both <br />by the Division and the Department of Energy, The DOE currently holds the bulk of the bond and the total <br />amount appears adequate for reclamation of the site. <br />I & E Contact Address <br />NAME: Ikon Coram <br />OPERATOR: bold Eagle Mining Inc. <br />STREET: A45 E. Main Street <br />CITY/STATE/ZIP: Montrose. C(7 81401 <br />Cc ^ CE <br />^ BL <br />^ FS <br />^ HW <br />^ HMWMD (CH) <br />^ SE <br />^ WOCD (CH) <br />X OTHER: Harry Posey,DMG <br />