Laserfiche WebLink
(Page 2) • <br />MINE ID # OR PROSPECTING ID # M-84-099 <br />INSPECTION DATE June 5. 1998 INSPECTOR'S INITIALS TAS <br />OBSERVATIONS <br />1. A site inspection was made at the request of Mr. Rex Fletcher of the Omaha District, U.S. <br />Army Coxes of Engineers. The purpose of the inspection was to discuss the resolution of an <br />existing Section 404 violation. Present during 'the inspection were Mr. Fletcher of the COE, <br />Rick Huff of Hall-Irwin Construction Co., and Steve O'Brian of Environment, Inc. <br />2. The site inspection revealed that the operator is in compliance with the approved mining <br />and reclamation plan, in spite of a pending Section 404 violation. The area of violation <br />occurs in the southern portion of the permit area along the north and south banks of various <br />sections of the St.Vrain Creek. St.Vrain Creek had severely eroded a number of banks within <br />the permitted area during previous high flow events. In response, the operator had applied <br />riprap to stabilize the eroded banks. The repair work, unfortunately, was done without prior <br />approval of a Section 404 Permit. Since then, the Corps of Engineers has issued a Section <br />404 Permit to the operator which requires that the banks be stabilized and that wetlands <br />vegetation be replanted. <br />3. In order to resolve the 404 Violation, the operator will need to reconstruct the banks of <br />St.Vrain Creek in several places to allow for establishment of wetland vegetation. Mr. Huff <br />and Mr. O'Brian were advised that such a change to the existing slopes and reclamation, <br />within the M-84-099 permitted area, can be permitted under the terms of a technical revision. <br />The technical revision application should include a map of the area(s) to be reconstructed, <br />a representative schematic of the work to be done, the size of riprap to be used, an estimate <br />of the number of linear feet of bank to be reworked, and a unit cost/linear foot for the <br />reconstruction work. <br />4. The approved mining plan requires that the operator maintain a minimum setback distance <br />of 100 feet from the water line of St.Vrain Creek. The proposed bank reconstruction and <br />revegetation effort should not adversely affect the reclaimed lake that is located at least <br />100 feet from the water line of the Creek. <br />I & E Contact Address <br />^ CE <br />NAME Jeff Greaa ^ BL <br />OPERATOR Hall-Irwin Construction Co. ^ FS <br />STREET 3026 4th St. P O. Box 519 ^ HW <br />CITY/STATE/ZIP Greeley. CO 80631 ^ HMWMD (CH) <br />^ SE <br />cc: Carl Mount, DMG ^ WQCD (CH) <br />^ OTHER <br />Steve O'Brian <br />Environment, Inc. <br />7985 Vance Dr., Suite 205A <br />Arvada, CO 80003 <br />Rex Fletcher <br />Department of the Army <br />Corps of Engineers, Omaha District <br />215 North 17th Street <br />Omaha, Nebraska 68102-4978 <br />