My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC03409
DRMS
>
Back File Migration
>
Inspection
>
INSPEC03409
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:58:11 PM
Creation date
11/18/2007 8:10:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
Inspection
Doc Date
9/4/1997
Doc Name
Insp Rpt
From
DMG
To
Climax Molybdenum Company
Inspection Date
9/4/1997
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
` ~ (Page 4) <br />MINE ID # OR PROSPECTING ID # M-77-493 <br />INSPECTION DATE 9/4/97 <br />INSPECTOR'S INITIALS ACS <br />6 . 3 -Dam'-~^~~ , <br />3-Dam impounds the Ten Mile Tailing Pond, and is located in the Ten Mile Creek drainage <br />basin. The 3-Dam grading and capping project was inspected. During the summer of 1997, the <br />3-Dam out slope was graded to a consistent 3:1 slope, and capping material derived from <br />borrow areas located below the dam was applied. The last loads of this capping material were <br />being spread during the day of this inspection; this final capping of 3-Dam is a substantial <br />achievement under the terms of the Climax Mine reclamation plan. In addition to the borrowed <br />capping materials, the old aggregate pile, identified as area C19 in the 1989 permit <br />amendment, was used and depleted in the 3-Dam capping project. <br />The main borrow area for the 3-Dam capping project was inspected. Reclamation sloping of <br />this pit was underway. The regraded borrow pit slopes were measured at 17 degrees, or <br />3.25:1, This sloping betters the reclamation sloping objectives for the borrow areas. <br />7. Other Inspected Locations <br />Mayflower Pond and 5-Dam were inspected, including the area of the inactive ion-exchange <br />water treatment plant at the toe of 5-Dam. The Ten Mile drainage ground water monitoring <br />locations were pointed out. No problems were noted at these locations. The historic mining <br />disturbances in Searle Gulch were inspected. These disturbances are not covered by the <br />approved reclamation plan for the Climax Mine. The operator is routing contaminated drainage <br />from these pre-law disturbances onto the Climax Mine water treatment and discharge system. <br />2 & E Contact Address <br />NAME Bryce Romia <br />OPERATOR Climax Molybdenum Company <br />STREET Climax Mine <br />CITY/STATE/ZIP Climax. CO 80249 <br />cc: Carl Mount, DMG <br />^ CE <br />^ BL <br />^ FS <br />^ HW <br />^ HMWMD (CH) <br />^ SE <br />^ WQCD (CH) <br />^ OTHER <br />
The URL can be used to link to this page
Your browser does not support the video tag.