Laserfiche WebLink
III. COMMENTS -COMPLIANCE ~/ C'-'~j~ .,~0~ <br />P~y~ a~~. a~ ~ <br />Below are comments on the inspection. The comments include discussion o observaitons <br />made during the Inspection. Comments also describe any enforcement actions taken during <br />the inspection and the facts or evidence supporting the enforcement action. <br />This was a partial inspection of the Hayden Gulch Mine conducted by Jim Stark of <br />CDMG. The mine has gone through a Phase I and Phase II Bond Reiease on alt but <br />approximately nine acres. The weather was warm and sunny and the ground was <br />dry. <br />Shrub parcel HG-08 was stable and well vegetated. All of the vegetation was green <br />due to the large amount of precipitation this spring. There were no rills or gullies seen <br />at the time of the inspection. The spring on the south side of parcel HG-08 was not <br />flowing at the time of the inspection (although it does appear as though it has flowed <br />this spring). Pond HG-08 contained water but was not discharging. <br />Shrub Parcel E was also stable and well vegetated. All of the vegetation at parcel E <br />was green and looked good. There were no erosional problems noted at the time of <br />the inspection. <br />Shrub parcel 003 was stable and well vegetated. The vegetation was all green and <br />doing well. There were no erosional problems noted on parcel 003 at the time of the <br />inspection. Pond 003 contained water but was not discharging (and it did not <br />appear that the pond had discharged recently). <br />The 1997 slump area appeared to be stable at the time of the inspection. All of the <br />alignment stakes placed across the slope remained aligned. The area was well <br />vegetated and all of the vegetation was green and appeared to be doing well. <br />There were no erosional problems noted on the slump area. <br />No wildlife was seen on the site at the time of the inspection. <br />