Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made during the inspection. Comments <br />also describe any enforcement actions taken during the inspection and the facts or evidence supporting the enforcement action. <br />Jerry Nettleton (Nettleton) of Twentymile Coal Company (Twentymile) accompanied Byron Walker (Walker) <br />of the Colorado Division of Minerals and Geology (Division) during this inspection of the Foidel Creek Mine. <br />AVAILABILITY OF RECORDS <br />See the DMG Availability of Records check sheet attached. All records were found on file. <br />ROADS <br />The road to the 6 North Mains Ventilation Shaft site was completed. The relocation of windrowed topsoil <br />from the 18-Right Ventilation Shaft road had started, and the road re-shaped accordingly. <br />HYDROLOGIC BALANCE <br />The perimeter ditches about the 6 North Mains Ventilation Shaft site, and the containment sedimentation <br />pond, had been constructed. <br />The results of impoundment inspections are summarized below. <br /> Condition of Condition of At least 60% <br /> <br />Outfall <br />Impoundment Estimated <br />, <br />discharge <br />discharge <br />embankments and capacity <br /> <br />(visual <br /> structure inslopes estimate ? <br />CDPS Permit CO-0027154(Foidel Creek Mine) <br />002A T, Sediment None Good Good Yes <br />003A B, Sediment 0.037 cfs2 Good Good Yes <br />004A C, Sediment None Good Good Yes <br />OOSA D, Sediment 0.04 cfs3 Good Good Yes <br />006A E, Sediment None Good Good Yes <br />007A F, Sediment None Good Good Yes <br />008A G, Sediment None Good Good Yes <br />CDPS Permit CO-0042161: (Foidel Creek Mine) <br /> Fish Creek None <br /> Borehole, (however, <br />OOlA Good Good N/A <br /> mine water the ponds <br /> treatment were full) <br />C-1982-056. CC Inspection of November I5, 2005 Page 3 of 7 pages. BGW <br />