Laserfiche WebLink
• COLORADO DIVISION OF NINERAL$ ANO GEOL~ <br />SCRAPER COST 8 PROOUCiION DATA 40RKSNEEi Shee t 1 of 2 sheets R EFERENCES: 1) COST REFE RENCE GU IDE <br />-------------------------- ----------^--- 2) CONTRACTORS EOUIPHENT CO ST GUIDE <br />REVISION DATE: April, 1997 3) COLORADO CONTRACTORS ASS OCIATION <br /> --^--------------- WAGE RATE SCHEDULE <br />40RKSHEEi FILENAME: 623E•ROP .4K1 4) CATERPILL AR PERFORMANCE XANDBOOK <br />XALXINE DESCRIPTION: CAi 623E ELEVATING <br />------------------- SCRAPER WITH ROPS <br />----------------- CAB <br />-------- <br />-------- <br />--- <br />COST ADJUSTMENT FACTORS BASE VALUE ADJUSTED VALUE <br />Acquisition Cost: 5424,200.00 5310,086.81 <br />Economic Life Hours: 13420 12000 <br />ROPS tab Econ. Life Hrs: 12250 N/A <br />Annual Use Hours: 2112 1450 <br />Mech. Labor Cost-2one 1: 527.15 527.15 <br />-Zone 2: 527.15 527.15 <br />fuel Cost per gal.: 51.07 51.07 <br />Luhe Cost: 54.16 54.16 <br />Tire Life Mours: 2700 2600 <br />Tire Purchase Price: E28,L85.00 522,906.80 <br /> --- BASE 04NERSHI P 8 OVERHAUL COSTS ----~- ------- ------- -BASE OPERATING COSTS -- -------- <br />BASIC NODEL 8 ATTACHMENTS I DESCRIPTION ~ DEPRECIATION OHD/CFC LABOR PARTS LABOR PARTS FUEL LURE TIRES G.E.C. <br />__________________________ <br />Machine Model No. ____________________ <br />CAT 623E 4/ROPS _________________ <br />515.45 ________ <br />514.96 ________ <br />54.63 _________ <br />518.65 _______ <br />57.20 _______ <br />514.35 _________ <br />514.84 ___y ___ <br />5'.ib _______ <br />510.55 ________ <br />51.02 <br />Attachment ~1 N/A 50.00 50.00 50.00 50.00 50.00 50.00 50.00 $0.00 50.00 50.00 <br />Attachment #2 N/A 50.00 50.00 50.00 $0.00 50.00 50.00 50.00 50.00 $0.00 50.00 <br />Attachment k3 N/A 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 <br />BASE COST SUBTOTALS 515.45 514.96 54.63 518.65 57.20 514.35 514.84 54.16 510.55 E1 .02 <br />- ~ ~ -- ADJUSTED 04NER SHIP 8 OVERHAUL COSTS -I- ------- --- ADJUSTED OPERATING COSTS -~- ------- <br />COST ADJUSTMENT FACTORS ~ FACTOR VALUE ~ DEPRECIATION OHD/CFC LABOR PARTSI LABOR PARTS FUEL LUKE TIRES G.E.C. <br />Acquisition Cosi 0.7310 511.29 N/A N/A N/A N/A N/A N/A N/A N/A N/A <br />Economic Life 1.1183 512.63 N/A 55.18 520.86 58.05 516.05 N/A N/A N/A N/A <br />Annual Usage 1.4566 516.L5 ~ 521.79 N/A N/A N/A N/A N/A N/A N/A H/A <br />Double shifts .750depr.•.SOOohd 512.34 510.90 N/A N/A N/A N/A N/A N/A N/A N/A <br />Triple Shifts .667depr.-,333ohd 510.97 57.26 N/A N/A N/A N/A N/A N/A N/A N/A <br />Mechanic Cost Zone 1 1.0000 N/A N/A $5.18 H/A 58.05 N/A N/A N/A N/A N/A <br />- Zone 2 1.0000 N/A N/A 55.18 N/A 58.05 N/A N/A N/A N/A N/A <br />Fuel/tube/lire Cost Variable H/A N/A N/A N/A N/A N/A $14.8» 54.16 58.81 51.02 <br />Scraper Util. - Zone 1 100.007. N/A N/A 55.18 520.86 58.05 516.05 514.84 54.16 58.81 $1.02 <br />- Zane 2 100.007. N/A N/A 55.18 520.86 48.05 516.05 514.84 54.16 58.81 51.02 <br /> <br />ADJUSTED COST SUBTOTALS <br />-S.SHIFT -ZONE 1: <br />516.45 <br />521.79 <br />55.18 i <br />520.86 <br />$8.05 <br />516.05 <br />$14.84 <br />$4.16 <br />58.81 <br />51.02 <br /> -ZONE 2: $16.45 $21.79 55.18 520.86 58.05 516.05 514.84 5:.16 58.81 $1.02 <br /> -D.SHIFiS-ZONE 1: 412.34 510.90 $5.18 520.56 58.05 516.05 514.84 54.16 58.81 51.02 <br /> •20NE 2: 512.34 510.90 55.18 $20.86 58.05 816.05 514.84 $4.16 58.81 51.02 <br /> -T.SHIFTS-ZONE 1: 510.97 57.25 $5.18 520.86 58.05 516.05 514.84 54.16 58.81 51.02 <br /> -ZONE 2: 510.97 $7-26 55.18 $20.86 58.05 516.05 514.84 54.16 $0.81 ' 51.02 <br />