Laserfiche WebLink
• • III IIIIIIIIIIIIIIII <br />999 <br />DEPARTMENT OF NATURAL RESOURCES <br />Davitl H. Getchea Executive Director <br />MINED LAND RECLAMATION DIVISION <br />DAVID C. SNELTON, Diroctor <br />Richard D. Lamm <br />Governor <br />June 15, 1984 <br />T0: Blue Ribbon Coal Company File No. C-047-81 <br />FROM: David C. <br />Shelt~ 5 <br />RE: Field Visit on May 29, 1984 <br />I arrived at the site at approximately 4:00 PM. No employees were there <br />except a security guard. The security guard allowed me to drive up to the <br />bench to look at the slope failure. I was amazed to see how much of the bench <br />was no longer useful as a result of the failure. <br />I examined the area around the coal stockpile near the guard shack since this <br />had been the subject of a past violation. All the drainage from that area <br />does not clearly pass through a sediment control system. The MLRD needs to <br />work further with the permittee in this area. <br />/mab <br />Doc. No. 2100 <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (30~) 866-3567 <br />