My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC03250
DRMS
>
Back File Migration
>
Inspection
>
INSPEC03250
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:58:06 PM
Creation date
11/18/2007 8:09:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Inspection
Doc Date
12/9/1994
Doc Name
OSM MINE-SITE EVALUATION INSPECTION REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P . • F <br />VP 1 <br />o ` ., ~~ m U. S. DEPT. OF THE INTERIOR ~~~ ~~~~~~~~~~~~~~~~ <br />t a OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT o <br />~,,q-~_,0,q ~ Mine-Site Evaluation Inspection Report °FOpS~FA~{; <br /> RECEIVED lo. Type <br />1. Permit[ee/Person 9. Permit Number a. Permit b. RA <br /> NATIONAL KING COAL CO. C-035-81 Ut(, PP ~S <br /> 2. Address 11. Inspection Date 12. Inspection Type 13. Joint Inspection <br /> do CARYL HELMIN, IU30l94 IVISiOfI QCMtf1B 815 d Cit;DIOg~ Y/N <br /> MM OD - YY <br />3. City 4. State 14. Permit Status l5. Sire Status 16. Facility Type <br />DURANGO CO A~ AP <br />5. Zip Code 6. Phone Number ]7. OSM Office # 18. RSI # 19. Land Code <br />81301 -~ 303-3854528 020 <br />7. Operator if Different than Perm ittee 20. M.S.H.A. ID # 21. State Code 22. County Code <br /> <br /> OS-00266 08 067 <br /> 8. Mine Namc 23. AVS Permiaee Entity ID Number 23b. State Office <br /> KING COAL 078955 <br /> <br />24. Performance Standard Categories <br />Codes: 1=Com liance 2=Noncom liance 3=Not Plann 4=Not Sta =Noncom liance Identified Elsewhere <br />A. Administrative D. Backfilling & Grading H. 1 Subsidence Control Plan <br />1. 1 Mining within Valid Permit 1. 3 Exposed Openings I. Roads <br />2. l Mining within Bonded Area 2. 1 Contemporaneous Reclamation 1 <br />1 Road Construction <br />3. 1 Terms & Conditions of Permit 3. 3 Approximaze Original Contour <br />- . <br />2 <br />1 Certification <br />4. 1 Liability Insurance 4. Flighwall Elimination <br />3 . <br />3. 1 Drainage <br />5. 1 Ownership and Control 5. 3 Steep Slopes (includes downslope) <br />- 4. 1 Surfacing and Maintenance <br />6. 3 Temporary Cessation 6. Handhng of Acid & Toxic Materials <br />3 5. 3 Reclamation <br />B. Hydrologic Balance 7. 3 Stabilization (rills and gullies) <br />1. 1 Drainage Control E. Excess Spoil Disposal J. Signs & Markers <br />2. 1 Inspections & Certifications 1. 1 Placement 1. 1 Signs <br />3. 1 Siltation Structures 2. 1 Drainage Control 2. 1 Markers <br />4. 1 Discharge Structures 3. 1 Surface Stabilization K. 1 Distance Prohibitions <br />5. 1 Diversions 4. 1 Inspections & Certifications <br />6. 1 EfFluent Limits L. Revegefation <br />7. 1 Ground Water Monitoring F. Coal Mine Waste 1. 1 Vegetative Cover <br />8. 1 Surface Water Monitoring (Refuse Piles/Impousdmeots) 2. 1 Timing <br />9. 1 Drainage -- Acid-Toxic Materials 1. 1 Drainage Control <br />]0. 1 Impoundments 2. 1 Surface Stabilization M. 3 Postmining Laod Use <br />11.1 Sueam Buffer Zones 3. 1 Placement <br /> 4. 1 Inspections and Certifications N. Other <br />C. Topsoil & Subsoil 5. 3 Impounding Structtrres <br />1. 1 Removal G. Use of Explosives -1) <br />2. 1 SubstituteMaterials <br />1 S <br />d P <br />3 <br />i 1. 3 BLtsterCertitication <br />2) <br />torage an <br />. <br />rotect <br />on 2. 3 Distance Prohibitions - <br />4. 3 Redistribution 3. 3 Blast Survey/Schedule <br />3) <br /> 4. 3 Warnings & Records - <br /> 5. 3 Control of Adverse Effects <br />25. Inspection Frequency 26. Inspection Hours 27. Bonded Acres 28. Acres <br />a Date of Last <br />Stale Complete 07/13/94 <br />Ins <br />eaion <br />~ <br />4 <br />0 <br /> <br />a <br />Permit Review <br />~ <br />10 <br />3 a. Total <br />bonded <br />p . . . 1082.0 a <br />Pemuned <br />Frequency for previous 4 Calendar Qlrs b. Phase I . <br />b. Number of Number o1 <br />~mp~ete ^q i~pedions ^q 2.5 b. Inspection Time 0.0 <br />~ released <br />10.2 b. Disturbed <br />inspections anduded <br />1 l.0 <br />T <br />Ti <br />~•0 c. Phase D <br />relea <br />ed (Estimated) <br />c. Number of Number of c. <br />ravel <br />me s <br />required ^ partial ^ <br />partial g inspeaions g <br />4.0 <br /> <br />d <br />iti <br />R <br />W <br />0.0 <br />d. Phase III <br />Page 1 of 3 <br />inspections alluded . <br />r <br />ng <br />eport released ~,,,,,,,,,,.~,~, <br />
The URL can be used to link to this page
Your browser does not support the video tag.