Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made during <br />the inspection. Comments also describe any enforcement actions taken during the inspection and the <br />facts or evidence supporting the enforcement action. <br />This was a partial inspection of the Coal Gulch Mine conducted by Tom Kaldenbach of the Colorado Division of <br />Minerals and Geology. No one else was present. <br />The permit for this mine was revoked more than 10 years ago. DMG's IML program had reclamation work done <br />on the site in September 1994. <br />Vehicle access from Hwy. 160 into the Coal Gulch site was blocked with a cable. The ground was dty. <br />Hydrologic Balance <br />The lower pond contained a small pool of water, several feet below the primary spillway culvert. <br />Slides and Damage <br />No slope stability problems or erosion was evident. <br />Reclamation Success <br />Vegetation cover appears good on the disturbed areas. No problems were found at the site. <br />