Laserfiche WebLink
[ I I. Comments -Compliance <br />Below are comments on the inspection. The comments include discussion of <br />observations made during the inspection. Comments also describe any <br />enforcement actions taken during the inspection and the facts or evidence <br />supporting the enforcement action. <br />On May 13, 1993 a partial inspection was conducted at the Marr Strip Mine. <br />At the time of the inspection the weather was clear warm and dry. Most of <br />the snow has melted, except for north facing slopes were snow has drifted. <br />Present during this inspection was Charlie Finiau. <br />During this inspection Notice of Violation C-93-021 was terminated. The <br />required records that were missing were on site as required in the <br />regulations and as part of the abatement. See attached notice of termination. <br />During the inspection Charlie Finiau said that Kerr Coal was planning to <br />increase backfilling volumes considerably above committed to amounts and was <br />hoping to complete backfilling this year. This would be much ahead of the <br />committed to schedule. Scrapers would be used. <br />Ponds D and F were inspected. These ponds were not discharging as they <br />were during the last inspectoion. <br />