Laserfiche WebLink
BERM W /MAIM. <br />ROAD <br />MINING 12'• MAX. BERM 50" BERM <br />LIMB HEIGHT — <br />RESERVOIR AMENDMENT <br />BOUNDARY RESERVOIR MAIM. ROAD <br />WATER SURFACE 1 I •�•� -- — •• - -� -- <br />BASE OF <br />RESERVOIR <br />' _ KtStKVUIK 1 <br />DETAIL 1 <br />II <br />ULIAIL Z <br />I.------'--'--------------- <br />_--- _----- - - <br />-�\� <br />u <br />ill OF WATER <br />J <br />J I (3515 AC. R. OF SfOPAGE) <br />ill <br />SCALE: NTS <br />1 II <br />SCALE: NT5 <br />i <br />RESERVOIR SIDE —SLOPE DETAIL <br />RESERVOIR DIKE DETAIL <br />I i <br />(CLAY —LINER ONLY & CLAY —LINER WITH BERM) <br />NOTES: 1 <br />� <br />I <br />NOTES: <br />/ <br />/ <br />.- <br />ACCESS ROAD- ,- �/ <br />o�TO <br />j <br />1.) <br />THE DIKE SEPARATING RESERVOIRS 1. AND 2. WILL BE <br />T - <br />r <br />1.) <br />THE CLAY LINER FOR THE RESERVOIR SIDE SLOPES WILL <br />/ <br />CONSTRUCTED OF COMPACTED SHALE /OVERBURDEN <br />o <br />Ij <br />BE CONSTRUCTED OF COMPACTED SHALE /OVERBURDEN AND WILL <br />AND WILL SUPPORT A MAINTENANCE ROAD AND A GATED CONDUIT <br />I0 <br />BE KEYED INTO THE SHALE BEDROCK A MINIMUM OF 3 FT. <br />PIPE TO OPERATE THE RESERVOIRS SEPARATELY OR IN COMBINATION. <br />/ <br />/ <br />I / <br />2.) <br />WHERE BERMS WILL BE REQUIRED TO CONSTRUCT THE RESERVOIR, <br />2.) <br />THE WATER LEVEL IN RESERVOIR 2. WILL BE APPROXIMATELY 5 FT. <br />THEY WILL BE CONSTRUCTED OF COMPACTED SHALE /OVERBURDEN AND <br />LOWER THAN THE WATER LEVEL OF RESERVOIR 1. <br />WILL EFFECTIVELY BE A PART OF THE CLAY LINER. <br />3.) <br />THE DIKE WILL BE KEYED INTO THE SHALE BEDROCK A MINIMUM OF 3 FT. <br />3.) <br />BERM HEIGHTS WILL BE A MAXIMUM OF 6 FT. WITH 2:1 SIDE SLOPES <br />ON THE OUTBOARD SIDE AND 3:1 ON THE INBOARD SIDE. <br />4.) <br />A MINIMUM OF 3 FT. OF FREEBOARD WILL BE MAINTAINED BETWEEN THE <br />/ <br />'x <br />THEY MAY SUPPORT A MAINTENANCE ROAD. <br />WATER SURFACE AND THE CREST OF THE DIKE. <br />4.) <br />WHERE BERMS ARE CONSTRUCTED, THEY MAY BE BUILT UP TO THE <br />AMENDMENT BOUNDARY ON THE UNMINED, NATURAL GROUND OF THE <br />/ <br />SETBACK AREAS (MIN. OF 10 FT.). <br />5.) <br />A MINIMUM OF 3 FT. OF FREEBOARD WILL BE MAINTAINED BETWEEN <br />THE WATER SURFACE AND THE CREST OF THE RESERVOIR. <br />i' <br />' _ KtStKVUIK 1 <br />II <br />( :2N AC. FT. OF STORAGE) _ -�� <br />\ -k <br />'�'' Q suRFAGE ACRES <br />u <br />ill OF WATER <br />J <br />J I (3515 AC. R. OF SfOPAGE) <br />ill <br />1 II <br />1 <br />/ <br />/ <br />.- <br />ACCESS ROAD- ,- �/ <br />o�TO <br />j <br />o <br />Of <br />T - - �. — — -- -- <br />_ <br />T - <br />r <br />/ <br />o <br />Ij <br />I0 <br />/ <br />I / <br />RECENED <br />V EB 'z � 2000 <br />owsion of mIne(ays & taeONI <br />EXHIBIT F. <br />RECLAMATION PLAN MAP <br />IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII <br />O D l l o, 4 <br />