Laserfiche WebLink
I,cncrul \linc flan (onu+liancc <br />l he timetable and schedule ti,rcumphting reclamation is set ti+rth on page ~-33 0l the permit application, <br />as titlluws: <br />"Recl:un:uiun of the ('arbun Junction \line is slated to hcgin in the autumn ul 2002 and continue through <br />attnpletiun. ('he completion ufthc tasks identified and d~scrit+ed abo~r /i. e•. rrrn.,l rerlunuuiun rcc.,ke - TAJ <br />is anticipated to take three constntetion seasons (through sumnur of 2000. 11'ith runtpktion of the <br />eanhmuving and rrtupsuiling, seeding and plaming is contemplated in the autumn of 2005. Should this <br />timetable need to he altered. Ufil ,till apprise (~I)\1c ~ and rep isc the permit." <br />l~he last siutiticant amount of reclamation actin in in the perntit area was in 200; when the South pit urea <br />,~a. rrcluimcJ. 7 he pennittce currentl~• is in amtpliancc with the timetable and schedule un page 5-33. <br />Slides and Dumuee <br />Oil (ur hydraulic 11uid1 h:n leaked Inxn old caul mining cyuipmcnt unto the gnnntd at two location. at <br />the south end ol~thc permit area. The total area utcontaminateJ ground was estimated to he Iess than <br />100 square lief. The cuntaminateJ soil should immediately hr cleaned up to the appropriate st:mdards. <br />1 hi. eyuipntcnt. t chides, and junk. and the low areas appear to he the reclamation obligation of the <br />coal mininL prrmittec. <br />