Laserfiche WebLink
~ i <br />III. Comments - Compliance <br />Below are particular issues with regard to any of the compliance items. <br />Enforcement actions resulting trom failure to comply with the Act, Rules <br />and Regulations, and the permit also are identified below. <br />liydrulogic Balance (4.05) <br />I. Gravel surfacing adjacent to the tracks at the base of the fill <br />should be completed to insure that coal fines are contained within the <br />i.n~r~ediate vicinity of the load-out conve;~or. <br />2. A plan for controlling sedimentation from the topsoil stockpile east <br />of the sediment pond should be submitted. <br />Revegetation (4.15) <br />1. Interim revegetation as specified in the permit must be completed by <br />December 1, 1933. <br />Support Facilities (4.04) <br />1. A minor revisron addressing the equipment storaye yard in the <br />northeast corner of the permit area should be submitted to the Division. <br />