Laserfiche WebLink
~M <br /> <br />STATE OF III IIIIIIIIIIIII III <br />999 <br />COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Rewurces <br />1713 Sherman 51., Room 215 <br /> <br />Denver, Colorado 80201 I <br />~~ <br /> <br />Phone: 13031 866-3567 II <br />^ <br />FAX: (301) 832-8106 <br /> DEPARTMENT OI <br /> ~I <br />March 5, 1997 ~$~LJR <br />Ms. Pam Williams Roy Romer <br />Governor <br />$On[}IdoWn, Ine. lames5 Lxhhead <br />1200 Smith Street, Ste 2400 Executive Director <br />Houston, TX 77002 Michael B. Long <br /> Division DireClor <br />Re: Silica Quarry, Permit No. M-77-361 , Succession Approval, Revision No. SO-001 <br />Dear Ms. Williams: <br />On March 5, 1997, the Division of Minerals and Geology approved the succession of operators from Southwestern <br />Cement Enterprises, Inc. to Southdown, Inc. for the Silica Quarry, Permit No. M-77-361. Southdown, Inc, is now <br />the permitted operator of the Silica Quarry, and as such, is responsible for all provisions in Permit No. M-77-361, <br />as well as those specified in the Rules and Regulations. Southwestern Cement Enterprises, Inc. is relieved of all <br />responsibilities concerning this operation. <br />Please Note: <br />1. All of the application materials, as amended and supplemented, are an integral part of your permit. They <br />have been incorporated into the permit by reference. We presume that you have a copy of all of these materials; <br />therefore, none have been enclosed with this mailing. We suggest that you keep a copy of the permit and the permit <br />application at the mining operation as a reference for operating personnel, to help ensure compliance with the terms <br />of the permit. <br />2. Changes m the mining and reclamation operations that differ from those described in the permit may require <br />a modification to the permit. We suggest consulting the Rules and Regulations and/or contacting us to determine <br />if a modification to the permit is necessary, Rule 1.10 pertains to Amendments, Rule 1.9 [o Technical Revisions, <br />and Rule ].I1 to Conversions. <br />3. On your permit anniversary date each year, you must submit an annual fee and annual report to us. Please <br />consult the Rules, Act, and your permit for specific requirements. <br />If you have any questions, contact me. <br />Sincerely, <br />Barbara D. Chiappone <br />Minerals Division Program Assistant II <br />cc: Norris P. Widener, Southdown, Inc., Lyons, Colorado <br />