Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task p 001 Stato :Colorado PormiU(oWr :M-1980.189 <br />Date : 04/112007 County :El Paso ADDreviation :ncvre <br />User : BMK Site :Yoder Pif Filename :M189.001 <br />Agency or organization name :Dl7MS <br />Permit or other job action as frcvn el lxuo ceunfy fu rocky mfn materials <br />Task descrlpbon back qll and grading <br />HOURLY EQUIPMENT COST <br /> easrc machmo : Cut D8R Surnls If 8SU 12(:0: Horsepower 910 <br /> Blado typo : Serer-Universal <br /> Attarhment no. 1 : RUPS Cab ShM basis : I peer day <br /> Attachment no. 2 : 1-shank upper <br /> Data source : (CRG) <br /> Uu4zation % <br /> <br />~g~t_ reakdown ; Ownorshlp cosVhour S58 06 NA <br /> Operating cbsVhour : S7.?, 7.5 t00 <br /> Ripper op.cosUhour: 54 l5 SU <br /> Operator cosVhour S32 78 NA <br /> Total unit CosUhour : S 159 04 Total float cosVhour : 5169.61 <br />MATERIAL QUANTITIES <br />lethal Swell loose <br />volume 4,767 LCY lartor. NA volume: 4,787 LCY <br />Source of estimated volume :exhrbd f <br />Sourro of estimated swell factor :NA <br />HOURLY PRODUCTION <br />Average push dlstanco : 250 foot <br />Unadjusted howdy producton : 377.8 LCYIhr <br />Maerial consistency descrlpton <br />ConsoG'r/afed stockpile <br />Average push gradient : 2.00 % (rrog) <br />Average site altitude : 5,300 loot <br />Matonal weght : 2.550 IbsILCY <br />Weight description <br />Earth - Ory packed <br />Job CondiOOn Corrogtion Fac(ors Source <br />Operator skill : 0 75 (avp J <br />Material consistency : 1.00 (Cat H8) <br />Dozing method : 1.20 (slop <br />Visibility : 1.00 (avg.) <br />Job efficiency. 0.83 (lshlll/day) <br />Spoil pile 0.80 (/nd•rp <br />Push gradient 1 05 I (Cat HB) <br />Altitude : 1.00 (Ca7 HB) <br />Material weight 0.90 ;Cat HBJ <br />Blade type : _1.00 (SrSU/UI <br />Net c:orreclwn : 0.56 <br />Adjusted and production : 212 99 _ LCYmr <br />Adjusted (feet production : ?12.99 LCYIhr <br />JOB TIME ANO COST <br />Fleet size ~ 1 Dozers) <br />Unit cost : 50.796 /LCY <br />total loh lima 22.48 Hours <br />Total pb wst S3,813 <br />