My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC02781
DRMS
>
Back File Migration
>
Inspection
>
INSPEC02781
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:57:49 PM
Creation date
11/18/2007 8:07:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1989056
IBM Index Class Name
Inspection
Doc Date
1/23/2002
Doc Name
TIMNATH PIT PN M-1989-056 INERT FILL INFORMATION
From
DMG
To
DON KEHN CONSTRUCTION INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 61 <br />Construction Materials Rule 3 <br />water line where slopes shall be not steeper than 3:1. ff a swinuning area is proposed <br />as a portion of the Reclamation Plan, the slope, unless otherwise approved by the <br />Board or Office, shall be no steeper than 5:1 throughout the area proposed for <br />swimming, and a slope no steeper than 2:1 elsewhere in the pond. <br />tt6(a)(o) (8) If the Operator's choice of reclamation is for agricultural or <br />horticultural crops which normally require the use of farm equipment, the Operator <br />shall grade so that the azea can be traversed with farm machinery. <br />(9) An Operator may backfill structural fill material generated within the <br />MLRB permitted area into an excavated pit within the pemmt area as provided for in <br />the MLRB Permit. If an Operator intends to backfill inert structural fill generated <br />outside of the approved permit area, it is the Operators responsibility to provide the <br />Office notice of any proposed backfill activity not identified in the approved <br />Reclamation Plan. If the Office does not respond to the Operator's notice within <br />thirty (30) days after receipt of such Notice by the Office, the. Operator may proceed <br />in accordance with the provisions of this Rule. The Operator shall maintain a <br />Financial Warranty at all times adequate to cover the cost to stabilize and cover any <br />exposed backfilled material. The Notice to the Office shall include but is not ]invited <br />to: <br />(a) a narrative that describes the approximate location of the <br />proposed activity; <br />(b) the approximate volume of inert material to be backfilled; <br />(c) a signed affidavit certifying that the material is c]ean and inert, <br />as defined in Rule 1.1(20); <br />(d) the approximate dates the proposed activity will commence <br />and end, however, such dates shall not be an enforceable condition; <br />(e) an explanation of how the bacld'illed site will result in a post- <br />mining configuration that is compatible with the approved post-mining land <br />use; and <br />(f) a general engineering plan stating how the material will be <br />placed and stabilized in a manner to avoid unacceptable settling and voids. <br />
The URL can be used to link to this page
Your browser does not support the video tag.