Laserfiche WebLink
<br />(Page 4) <br />tiINE ID ~` OR PROSPECTING ID / M-83-090 <br />INSPECTION DATE 4-15-94 INSPECTOR'S INITIALS ACS <br />The following problems (PB) and/or poeeible violations (PV) (and suggested corrective actions) were <br />identified during this inspection. The problems should be corrected by the dates given, or they <br />will become possible violations. The poeeible violations should be corrected by the dates given <br />to reduce their severity when considered by the Mined Land Reclamation Hoard. The inspector noted <br />on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />1 <br />Extraction area phasing and concurrent reclamation has not proceeded <br />in accordance with the approved plan. <br />Submit a technical revision ~dhich will clarify the mining sequence <br />ae it has occurred and how it: will occur in the future. <br />2 <br />Processing and plant site is still located north of pond .fl, instead <br />of south of the river as in the approved plan. <br />Include in the technical reviision a clarification of the plant site <br />location, and provide reclamation details for the plant site. <br />3 <br />4 <br />Broken concrete rubble stored at pond il. <br />complete reclamation seedingei and plantings in accordance with the <br />approved plan. <br />CORRECTION <br />DATE <br />6 / 1 / 94 <br />PB or PV PB <br />TOPIC(S) MP <br />6 / 1 / 94 <br />PB or PV PB <br />TOPIC(S) MP <br />6 ! 1 / 94 <br />PB or PV PB <br />TOPIC(S) MP <br />12 / 1 / 94 <br />PB or PV PB <br />TOPIC(S) RV <br /> <br />Tree and shrub plantings are behind the approved schedule. West and <br />south shorelines of pond /1 sire not seeded. <br />