Laserfiche WebLink
~~ ~ - <br />°Rl ~~ <br />~' ~ y ~ <br />i :- , ~ _ <br />~".y ~ ~ _ r~r~t^ <br />i~"-.• ....~~. <br />Photo 2 - vew hacklilling pl:m tiff \onh pit that the operator is considering suhmillingas a revision. (irac <br />pattern depicts area to he blasted. 13Ltsted material t~uuld tx graded to till area shown in orange. It <br />nrcesvtn. additional material Irom pemwnrntl} reclaintcd spoil area ane-half mile awa} would he <br />brought in to achieve a ,:1 slope. <br />General Mine Plan (unutliance <br />I he tintctable and schedule for completing reclamation is set li~nh on page 5-3. of the pemtit application, <br />as lidl~~~a~: <br />'Reclanruiun ufthe Carbon Junction bone is slated ut begin in the autumn of ZUU_' and continue through <br />completion. I Ite completion of llte tasks idcttti tied attd described above /i.e~ nx+.cr rrclunurtiun tusk.' - TK/ <br />is anticipated to take threx cunstntction seasons tthnxtgh summer of "_'O(lil, 1Uith completion of the <br />carthnxwing and rctupsoiling. seeding and planting i. contemplated in the autumn of'_'00>. Should this <br />tintecthle nred to he altered. OIfl will apprise ('U\1(i and revise the perntit." <br />I'he last significant amount of reclamation activity in the perntit area ~~as in _'001 ~~hen the South pit area <br />was reclninted. l he pennittee currenth is incompliance with the timetable and schedule on page i.i;. <br />