My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC02539
DRMS
>
Back File Migration
>
Inspection
>
INSPEC02539
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:57:40 PM
Creation date
11/18/2007 8:05:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994117
IBM Index Class Name
Inspection
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
2/28/1995
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• (Page 2) <br /> <br />MINE ID f OR PROSPECTING ID ~ M-94-117 <br />INSPE:CTION DATE 2/28/95 INSPECTOR'S INITIALS ACS <br />OBSERVATIONS <br />At a Formal Public Hearing held on January 25, 1995, the applicant (C.O.M., Inc.) indicated <br />that the freeboard in the Gold Hill impoundment stood at 32 inches. It was further indicated <br />that two of the three decant standpipes in the pond are functional. This inspection was <br />conducted to verify these representations. <br />It w:xs verified that two standpipes in the pond are functional. This was done by running <br />water- into the pipes and verifying that the water was reporting to the bulkheaded Hazel-A <br />ad it ae specified in Permit M-83-141. It was recommended to the operator that trash racks <br />be placed over the standpipes. <br />In ox•der to determine freeboard in the pond, a theodolite was set up and levelled on the dam <br />crest:. Differential levelling was utilized to determine relative elevations of a number of <br />point:e on the tailing surface and the dam crest. Plan dimensions were determined by pacing. <br />The e~levatione determined by this survey are relative to an assumed elevation of 8580 for the <br />top of the southernmost rebar driven into the dam crest. A copy of the survey notes is <br />atta<hed to this report. This survey information was utilized to prepare a tailing surface <br />contour map, a copy of which is attached to this report. <br />Freeboard ie a term that is part of the nomenclature for reservoirs that impound water, and <br />is deefined as the vertical distance between the low point on the crest of the embankment and <br />the reservoir water surface. The application of the term freeboard at a tailing impoundment <br />ie complicated by the fact that the elevation of the tailing surface fluctuates. If <br />freeboard at that Gold Hill impoundment were to be defined as the difference in elevation <br />betwExen the low point of the dam crest and the high point of the tailing surface, then the <br />survey completed by the Division indicates that the freeboard at the impoundment is less than <br />zero.. At the present time, the more critical evaluation factor may be consideration of <br />available storage capacity. The storage capacity at the Gold Hill impoundment was determined <br />using the survey data and the volumetrice feature of the engineering software "EarthVieion". <br />Available storage capacity based on this analysis is 10,700 cu. ft. It is estimated that <br />one-third to one-half of this capacity was taken up by ice, slush and water as of the 2/28/95 <br />site inspection, which would leave as little ae 5,350 cu. ft. of available capacity in the <br />pond. <br />An analysis was conducted to determine the volume of water that would report to the pond <br />during a 100 year - 24 hour storm event. This storm would amount to 4.6 inches of rain at <br />the rite according to Ted Zorich and Associates report contained in Permit M-83-141. This <br />evaluation assumed that the upland diversion ditches would be 100 percent efficient. Storm <br />water- reporting to the impoundment would include the rain that falls below the elevation of <br />the lowest ditch in the impoundment area, ae well ae runoff from the mill yard and the mill <br />building roof, which has been routed into the pond ae part of the site storm water management <br />plan. Running the analysis using hydrologic software "Storm•' indicates that 28,750 cu. ft. <br />of storm water would report to the tailing impoundment during the 100 yr. - 24 hr. event, <br />with a peak discharge of 5.18 cfe. A copy of the computer print-out is attached to this <br />report. <br />This analysis indicates that discharge to the pond during the design event would greatly <br />exceeed available storage capacity. If the decant standpipes were to become plugged, or were <br />otherwise unable to drain the pond, the dam would overtop. The Division considers any <br />relizince on the decant standpipes to diminish storm inflows to be an unsound practice; one <br />reaecm being that a pair of 2 in. pvc pipes could only pass a small percentage of the inflows <br />that would be realized during a large rainfall at the site. The 5.18 cfa peak discharge <br />woulcl be highly erosive on the steep outslope of the dam, and stability of the impoundment <br />could be threatened. The Division considers the lack of storage capacity to be the primary <br />immecliate concern at the Gold Hill Mill. A proposal to restore adequate capacity, probably <br />by raising the dam crest, will have to be submitted by the applicant, approved by the <br />Division, and implemented at the site, prior to the June 14, 1995 decision date for the <br />application. <br />The :following guidance should be utilized to determine adequate storage capacity, or <br />freeboard, for the Gold Hill Impoundment: <br />
The URL can be used to link to this page
Your browser does not support the video tag.