Laserfiche WebLink
III. COMMENTS • COMPLIANCE <br />Balow aro comments on the inspection. The comments include discussion of observations made during <br />the inspection. Comments also describe any enforcement actions taken during the inspection and the <br />facts or evidence supporting the enforcement action. <br />This was a complete inspection of the King Coal Mine for the month of February, 2003. The site is <br />operating at its normal rate. <br />RECORDS: Records were inspected and found to be in satisfactory condition. See page 5 of this report <br />for further deta0s. <br />HYDROLOGIC BALANCE: Both ponds had water and snow in them but were not discharging. All <br />culverts and ditches were inspected and found to be clear and able to properly function. <br />GENERAL MINE COMPLIANCE: The site is covered in snow but is operating in a sound and <br />environrnenlalty manner <br />EXCESS SPOILS AND DEVELOPMENT WASTE: The waste pile is stable and all water and melting <br />snow is diverted off the top. <br />