My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC02481
DRMS
>
Back File Migration
>
Inspection
>
INSPEC02481
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:57:38 PM
Creation date
11/18/2007 8:05:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Inspection
Doc Date
6/10/1997
Doc Name
FAX COLORADA FY 1997 OVERSIGHT REVIEW ENGINEERS REPORT NEW ELK MINE PERMIT C-81-012
From
SUSAN BURGMAIR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Ensure that designs are certified by a registered professional engineer. On the design <br />exhibits, engineers should certify that the design complies with the State program and <br />generally accepted engineering praaices. (When applicable, the permit should contain <br />documentation ofMSFIA approval. Whenever reviews reveal a difference between whet is <br />required in the State and Federal programs, OSM should require a State program <br />amendment.) <br />• As-built Certifications <br />Review engineered as-built certifications to verify that a professional engineer is attesting <br />to the fact that construRion was in conformance with the approved permit design. The <br />applicable permit exhibit should be referenced in the certification. <br />• Stream Channel reconstruction <br />Determine if recunst~ucted streams, and associated flood plains, are being restored to <br />suitable configurations and that erosion control measures have been adequately addressed. <br />• AOC/Variances to AOC/Excess Spoil 'c <br />Evaluate variances to AOC to determine if excess spoil piles are being designed to be <br />compatible with the surrounding terrain and will minimize erosion. All infomtation <br />pertaining to the approval should be documented in the permit files. <br />• Tracking ofNov's/Permit Stipulations and Revisions <br />The State method of ensuring compliance with permit stipulations and resolution of <br />NOV's could be evaluated with emphasis on 61e documentation. <br />• Bond Amounts/ldentification of Mining Disturbance <br />The assumptions upon which bond amounts are determined could be reviewed. Reviewers <br />could evaluate the adequacy of the worst-ease-reclamation scenario upon which bonds ere <br />based. Such a review would also reveal whether or not ell disturbed areas have been <br />clearly identified and an adequate reclamation schedule was provided. (A reclamation <br />schedule is especially important at mines where the operation is in temporary cessation, as <br />is the case with the New Elk Mine.) <br />Glen Golden Date <br />Civil Engineer <br />DFD, WRCC <br />June 30, 1997 ~ <br />S iS ~'90i8ZE86 -N S n ~ [ct~rn try is-o:.-r ,a n-~c <br />
The URL can be used to link to this page
Your browser does not support the video tag.