Laserfiche WebLink
<br />III. Comments - Compliance <br />Below are particular issues with regard to any of the compliance items. <br />Enforcement actions resulting from failure to comply with the Act, Rules <br />and Regulations, and the permit also are identified below. <br />4.05 Hydrologic Balance <br />All sediment ponds were holding water to varying degrees. The operator <br />stated that heavy precipitation in mid-August had forced him to pump <br />water from the pit into the sediment ponds, but that water was now under <br />control in the pit. <br />Ditch C had silted in at the NW corner and will require cleaning. <br />4.Ub Topsoil <br />Topsoil stockpile C experienced rilliny on the outslopes duriny the heavy <br />rains. Some topsoil from stockpile C will be spread on areas of the pit <br />and East Dump area this fall. Prior to winter the stockpile outslopes <br />should be repaired and/or reconfigured, and mulched and seeded to <br />minimize further erosion. <br />